Echo SRM-2400 TYPE 1E - 09-99 Operator's Manual page 18

Table of Contents

Advertisement

18
8.
Position lower U-Handle bracket (K) 400mm (15-3/4 in.) from
engine end of drive shaft. Secure with three (3) 5mm x 30mm bolts.
9.
Position harness hook 220mm (8-5/8 in.) from engine end of drive
shaft assembly. DO NOT tighten at this time.
10. Install upper U-Handle and bracket on lower bracket and secure
with one (1) 8mm x 55mm bolt (L) and large circular washer.
11. Install power head and align gear box, power head and U-Handles.
Tighten all screws.
12. Route throttle linkage and ignition lead assembly around front of
U-Handle bracket and clip to drive shaft as shown.
13. Place throttle linkage (D) through adjustment fixture (E) and install
wire end into large carburetor throttle swivel hole (C). Check
throttle for freedom of movement and that wide open throttle / low
idle extremes are adjusted properly. The throttle linkage must be
adjusted by moving the adjustment fixture (E). Consult with your
Echo Dealer for correct adjustment procedure.
WARNING
The cutting attachment should not rotate at idle. If attachment
rotates, readjust carburetor according to "Carburetor Adjustment"
instructions in this manual or see your ECHO Dealer, otherwise
serious personal injury may result.
SRM-2400
14A. Connect jumper lead (M) spade terminal end to power head
ignition lead (A). Install black wire holder (N) and ground lead (O)
on clutch case with bolt (B). Connect female (M) and male (O)
ignition leads to male and female lead from throttle linkage.
DANGER
400 mm (15-3/4 in.)
K
220 mm (8-5/8 in.)
L
D
E
C
A
M
O
B
ENGINE
END
N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents