Chapter 1: Introduction; Before You Start; Package Checklist - Biostar GF7100P-M7 Setup Manual

Hide thumbs Also See for GF7100P-M7:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 44

CHAPTER 1: INTRODUCTION

1.1
B
Y
EFORE
Thank you for choosing our product. Be fore you start installing the
mothe rboard, please make sure you follow the instructions be low:
Prepare a dry and stable work ing environment with
sufficie nt lighting.
Always disconne ct the compute r from powe r outle t
be fore ope ration.
Before you take the mothe rboard out from anti-static
bag, ground yourse lf prope rly by touching any safe ly
grounde d appliance, or use grounded wrist strap to
remove the static charge.
Avoid touching the compone nts on mothe rboard or the
rear side of the board unless ne cessary. Hold the board
on the edge , do not try to be nd or flex the board.
Do not leave any unfastene d small parts inside the
case afte r installation. Loose parts will cause short
circuits which may damage the equipment.
Keep the compute r from dange rous a rea, such as hea t
source , humid air and wate r .
1.2
P
ACKAGE
HDD Cable X 1
Se rial ATA Cable X 1
Rear I/O Panel for ATX Case X 1
Use r's Manual X 1
Fully Se tup Drive r C D X 1
FDD Cable X 1 (optional)
Se rial ATA Powe r Cable X 1 (optional)
USB 2.0 Cable X1 (optional)
S/PDIF out Cable X 1 (optional)
Note: The package contents may differ by area or your motherboard version.
S
OU
T ART
C
HECKLIST
GF7100P-M7
3

Advertisement

Table of Contents
loading

Table of Contents