Desa VGL18NRA Owner's Operation And Installation Manual page 14

Unvented (vent-free) gas log heater also design-certified as vented decorative appliances when not used with hand-held thermostat remote
Table of Contents

Advertisement

INSTALLATION
Continued
CONNECTING TO GAS SUPPLY
WARNING: This appliance
requires a 1/2" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualified ser-
vice person must connect heater
to gas supply. Follow all local
codes.
CAUTION: Never connect
propane/LP heater directly to the
propane/LP supply. This heater
requires an external regulator
(not supplied). Install the exter-
nal regulator between the heater
and propane/LP supply.
WARNING: Never connect
natural gas heater to private (non-
utility) gas wells. This gas is com-
monly known as wellhead gas.
Installation Items Needed
Before installing heater, make sure you have the
items listed below.
• piping (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• test gauge connection *
• sediment trap
• tee joint
• pipe wrench
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certified equipment shutoff valve from your
dealer. See Accessories, page 29.
14
For propane/LP units, the installer must supply
an external regulator. The external regulator will
reduce incoming gas pressure. You must reduce
incoming gas pressure to between 11 and 14 inches
of water. If you do not reduce incoming gas pres-
sure, heater regulator damage could occur. Install
external regulator with the vent pointing down
as shown in Figure 13. Pointing the vent down
protects it from freezing rain or sleet.
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
1/2" diameter or greater to allow
proper gas volume to heater. If
pipe is too small, undue loss of
volume will occur.
Installation must include an equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up. NPT
tap must be upstream from heater (see Figure 14,
page 15).
IMPORTANT: Install equipment shutoff valve
in an accessible location. The equipment shutoff
valve is for turning on or shutting off the gas to
the appliance.
Check your building codes for any special re-
quirements for locating equipment shutoff valve
to fireplaces.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could result
in clogged heater valves.
Propane/LP
Supply Tank
Figure 13 - External Regulator With Vent
www.desatech.com
CAUTION: Use only new,
Vent Pointing Down
Pointing Down
External
Regulator
112882-01D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vgl30praVgl18praVgl24nraVgl24praVgl30nra

Table of Contents