Alamo Industrial Flex-Wing Mechanical Level Lift Rotary Cutter/Shredder EAGLE 10/15 Operator's Manual page 154

Alamo industrial flex-wing mechanical level lift rotary cutter/shredder operator's manuals
Table of Contents

Advertisement

MAINTENANCE
Figure MntP-R-0014) Grease and install the sleeve
baring in groove at the end of the sleeve (only on
one half shaft).
Figure
MntP-R-0015)
Slide
the
shield
tube
assembly over the shaft, so that the bearing holes
in the shield align with the shield bearing groove on
the yoke.
Figure MntP-R-0016) Install two shield bearings per
half shaft by pushing one bearing in each bearing
hole. The shield bearings should be installed in the
direction of the shaft rotation relative to the shields
Figure MntP-R-0017) Attach safety decal as
needed.
EAGLE 15 03/09
Maintenance Section 5-10
©2009 Alamo Group Inc.

Advertisement

Table of Contents
loading

Related Products for Alamo Industrial Flex-Wing Mechanical Level Lift Rotary Cutter/Shredder EAGLE 10/15

This manual is also suitable for:

Eagle 10Eagle 15

Table of Contents