Dell PowerEdge 2420 Installation Manual page 21

Rack server
Hide thumbs Also See for PowerEdge 2420:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
1 Using a screwdriver, lower the leveling foot until it rests on the floor.
2 If you need to lower the foot further, tighten the hex nut clockwise
with a 12-mm wrench (see Figure 1-10).
Figure 1-10. Adjusting the Leveling Feet
1
3
3 Repeat steps 1 and 2 for the remaining leveling feet.
4 Ensure that the rack is level.
leveling foot stem
leveling pad
2
hex nut
Installation Guide
1
2
3
19

Advertisement

Table of Contents
loading

Table of Contents