Connecting The Water Supply - Maytag Ice2O MFI2568AES Use And Care Manual

Ice2o series french door bottom freezer
Table of Contents

Advertisement

Available languages

Available languages

Installation
To Install:
1. Align door handle clips
to the studs attached to
the freezer door.
2. Ensure the large hole in
the mounting clip is
positioned to the right
on both ends of the
handle.
3. Rotate the handle so that the handle is flat against
the door.
4. Grasp the handle firmly and slide handle to the
right.
To Remove:
1. With both hands, firmly grasp the handle toward
the right side.
2. Slide toward the left, lift and remove from the
surface.
Metal Handle
Materials Needed:
3
" Allen wrench
32
• Gloves to protect hands
Note:
Metal handles can scratch doors.
To Remove:
• Loosen set screws in
handle using
" Allen
3
32
wrench.
• Repeat the procedure on
all screws.
To Replace:
• Align handle with the
mounting posts.
• Fully tighten all set
screws to secure handle
in place.

Connecting the Water Supply

WARNING
To reduce the risk of injury or death, follow
basic precautions, including the following:
• Read all instructions before installing ice maker.
• Do not attempt installation if instructions are not
understood or if they are beyond personal skill
level.
• Observe all local codes and ordinances.
• Do not service ice maker unless specifically
recommended in Use and Care Guide or
published user-repair instructions.
• Water damage due to an improper water
connection may cause mold/mildew growth. Clean
up spills or leakage immediately!
CAUTION
To avoid property damage or possible injury,
follow basic precautions, including the
following:
• Consult a plumber to connect
tubing to household plumbing to assure
compliance with local codes and ordinances.
• Confirm water pressure to water valve is between
35 and 100 pounds per square inch, 20 pounds
per square inch without filter.
• Do not use a self-piercing, or
Both reduce water flow and can become clogged
over time, and may cause leaks if repair is
attempted.
• Tighten nuts by hand to prevent cross threading.
Finish tightening nuts with pliers and wrenches.
Do not over-tighten.
• Wait two to three hours before placing refrigerator
into final position to check and correct any water
leaks. Recheck for leaks after 24 hours.
• Verify the copper tubing under the sleeve is
smooth and free from defects. Do not reuse an
old sleeve.
1
" O.D. copper
4
" saddle valve.
3
16
8

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents