Checking Router Operation - Cisco 12416 Replacement Instructions Manual

Chassis replacement instructions
Table of Contents

Advertisement

Removing and Installing the Chassis
After performing the steps in the
Step 5
front covers. Refer to the Cisco 12016, Cisco 12416, and Cisco 12816 Router Installation and
Configuration Guide for detailed instructions.

Checking Router Operation

To restart the router and verify that it restarts successfully after replacing the chassis, follow these steps:
Verify that the following conditions are true:
Step 1
By default, a Flash memory card containing a valid Cisco IOS software image is inserted in PCMCIA
Note
slot 0 before the router is shipped. Also by default, the software configuration register is set to 0x0102,
which causes the router to boot automatically from the Cisco IOS software image stored on the Flash
memory card.
Ensure that a console terminal is connected to the RP console port and turned on, or that you have a
Step 2
remote login to the router from another device through a telnet session. (You will need to check the
startup banner and displays to ensure that the system restarts properly and that all the interfaces
reinitialize in the proper state.)
Switch on all source voltage circuit breakers that control power to your system.
Step 3
Observe the power module LEDs:
Step 4
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
22
All cards are fully inserted in their slots, and all captive screws are tightened.
Line card cable-management brackets are attached to their respective line cards and all captive
screws are tightened.
Interface cables are completely seated in their line card connectors.
Interface cables are routed neatly through the cable-management system.
Any empty card slots are filled with card blanks.
When the faceplate of a card does not completely fill the card slot opening, a narrow card filler panel
is installed to ensure proper air flow through the chassis and proper compliance with
electromagnetic compatibility (EMC) regulations.
Power modules are fully inserted in their bays and their ejector levers are all completely closed and
secured.
Power shelf cables are fully connected to both the power shelf and the power source, and are secured
with appropriate strain relief.
On a router equipped with the DC-input power subsystem, the power cable cover is installed over
the cable connectors on the back panel of the DC-input power shelf.
The Flash memory card that shipped with your system is installed in PCMCIA slot 0 of the RP.
When a AC-input power supply is seated in its power shelf bay and connected to an AC power source
supplying power within the required range, the green LED labeled PWR OK on the power supply
faceplate should be on and the power supply fan should also be on. This is normal behavior.
"Checking Router Operation" section on page
22, install the chassis
78-16082-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

1201612816

Table of Contents