Download Print this page
Frigidaire FRA12EZU2 Installation Instructions Manual
Frigidaire FRA12EZU2 Installation Instructions Manual

Frigidaire FRA12EZU2 Installation Instructions Manual

Slo3 air conditoner (8,000~12,000 btu)
Hide thumbs Also See for FRA12EZU2:

Advertisement

For SLO3 Air Conditoner (8,000~12,000 BTU)
Carefully read the installation manual before beginning.
Follow each step as shown.
Observe all local, state, and national electrical codes and by qualified, licensed, authorized personnel only.
Pay attention to danger and safety notices.
To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may
be exposed:
Air conditioners covered in this manual pose an excessive weight hazard. Two or more people are needed to move and install
the unit. Wear protective gloves whenever lifting or carrying the unit. AVOID the sharp metal fins of front and rear coils. To
prevent injury or strain, use proper lifting and carrying techniques when moving unit.
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit overan extended
period of time.
Handle air conditioner with care.
Make sure air conditioner does not fall during installation.
Tools and Parts:
Gather the required tools and parts before starting installation. Read and follow the instructions provided with any tools
listed here.
Flat-blade and Phillips screwdrivers
Level
Through-the-wall Installation:
In addition to the tools listed above, the following tools are needed for through-the-wall installation.
saw
Parts Supplied:
Check that all parts are included in parts package:
Hardware
screws

Installation Instructions

READ BEFORE INSTALLING UNIT
INSTALLATION WARNINGS AND CAUTION
TOOLS NEEDED
caulk
pan - head
Phillips screws
round - head
pan - head
Phillips screws
side curtains
TOOLS NEEDED
Tape measure
Qty.
3
2
Hardware
Top channel
Window sash seal
Foam seal
window lock bracket
Safety Lock
(for Vinyl-Clad window)
weather seals
Qty.
1
1
1
1
2
1

Advertisement

loading

Summary of Contents for Frigidaire FRA12EZU2

  • Page 1: Installation Instructions

    Observe all local, state, and national electrical codes and by qualified, licensed, authorized personnel only. Pay attention to danger and safety notices. To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed: Air conditioners covered in this manual pose an excessive weight hazard.
  • Page 2: Location Requirements

    Remove and dispose of / recycle packaging materials. Remove tape and glue residue from surfaces before installing the air conditioner. Rub a small amount of liquid dish soap over the adhesive with your fingers. Wipe with warm water and dry.
  • Page 3 Be sure your air conditioner cabinet does not fall out of the opening during installation or removal. The place where the power cord exits the air conditoner should be no more than 4 ft (122 cm) from a grounded 3 prong outlet.
  • Page 4 1. Extend the side curtains out against the window frame (FIG.11). 2. Drill holes and drive locking screws: A: For wooden windows: screws through the holes in the side curtains into the window B: For Vinyl-Clad windows: screw screw 3. Trim the weather seal...
  • Page 5: Complete Installation

    Through-the-Wall Cabinet Installation: Option 1—wood, metal or plastic molding: When using a wood, metal or plastic molding, the wood frame should line up with the inside wall as shown FIG.18. Option 2—Plastered wall with no molding: into the inside wall FIG.19.
  • Page 6 2. Use a level to check that cabinet is level side to side (FIG.23). 3. Check that air conditioner cabinet is tilted to the outside so that water could run to the outside. The cabinet should slop at least half-a-bubble towards the rear.

This manual is also suitable for:

Fra08pzu1