Unpacking & Assembly - Cumberland Stove Works OMMF3500 Operator's Manual

Cumberland ommf3500 multi fuel parlor stove operator's manual
Table of Contents

Advertisement

UNPACkING AND ASSEMBLY
The MF3500 parlor stove is bolted to a skid to prevent
movement during shipping. To free the stove from the skid
you must remove the two hold-down bolts in the base of
the unit.
Unpack all hardware located in the units hopper. The
following should be included:
(4) legs w/ leveler
(12) leg bolts
(4) tie-down straps
(4) tie-down bolts
ash shuttle rod
spring for ash shuttle rod
MOUNT LEGS
1. Gently tilt the stove on the side opposite of the
controller.
2. Assemble the legs using provided (12) leg bolts as
shown.
note: if unit is to be used in a mobile home, you
must install the (4) tie-down straps to the stove now.
refer to page 13 for instructions.
3. After all bolts have been tightened properly, set the stove
back up on its legs.
MOUNT HANDLE TO HOPPER DOOR
1. Using a Phillips screwdriver, attach hopper handle to
hopper door using pre-drilled holes.
ASSEMBLE ASH SHUTTLE ROD
1. Thread spring over non-threaded end of rod.
2. Place threaded end of ash shuttle rod through decorative
casting and screw into fire pot.
800-345-6007
hopper lid handle
power cord
round vent transition
gasket for round vent
(4) 1/4-20 x 1/2" bolts
(2) hopper lid handle
bolts
CumberlandStoveWorks.com
INSTALLATION AND OPERATION MANUAL
MF3500G, MF3500S, MF3500B Models
Leg Assembly
Hopper Door Handle Assembly
Ash Shuttle Rod Assembly
Page 9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mf3500gMf3500sMf3500b

Table of Contents