GE GFT14ESSMWW Owner's Manual & Installation Instructions page 19

Table of Contents

Advertisement

Available languages

Available languages

FINAL SETUP
LEVEL THE DRYER
1
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Lower
Raise
2
PLUG DRYER IN
NOTE: Stacking installations may require a power
cord up to 6 feet in length.
49-3000311 Rev 4
Installation Instructions
Ensure proper
ground exists
before use.
3
DRYER STARTUP
Press the Power button.
Power
NOTE: If the dryer has been exposed to temperatures
below freezing for an extended period of time, allow
it to warm up before pressing Power. Otherwise, the
display will not come on.
The dryer is now ready for use.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gft14

Table of Contents