Section 5: Mounting And Wiring; Prerequisites; Programming The Connected Panel; Before Mounting - Honeywell HW-AV-LTE-M Installation And Operation Manual

Clss pathway
Hide thumbs Also See for HW-AV-LTE-M:
Table of Contents

Advertisement

Honeywell Connected Life Safety Services | Honeywell Connected Life Safety Services

SECTION 5: MOUNTING AND WIRING

CAUTION: REQUIRED ENCLOSURE
THE COMMUNICATOR SHOULD ONLY BE MOUNTED WITHIN THE HW-AV-ENC ENCLOSURE.

5.1 PREREQUISITES

The following are required:
01.
Know whether to install CLSS Pathway for dialer capture or for panel relay monitoring.
02.
Know whether to install the CLSS Pathway for dialer capture with LAN (dual-path communications) or without LAN (sole
path).
03.
The panel should be programmed to support the CLSS Pathway.

5.2 PROGRAMMING THE CONNECTED PANEL

Program the following in accordance with the panel's programming document:
Enable the panel PSTN dialer.
l
Select the DTMF mode (for tone dialing).
l
Select the Contact ID communication format.
l
Provide any telephone number for dialing. Ex: 999999
l
Enter the 4-digit account number.
l
NOTE: If the panel has two central stations at two locations, program each account identically.

5.3 BEFORE MOUNTING

Inform the central monitoring station to put your CLSS Account on test.
l
If installing on an existing operational panel, inform the operator and the local authority that the panel will be a temporarily out of
l
service.
Ensure that the panel is powered down.
l

5.4 IMPORTANT CONSIDERATIONS

Check that you have the communicator, 3-ft antenna, and the Quick Start Guide from the carton box.
l
Only a regulated UL-listed UOJZ, UTOU, or NBSX control panel or power supply should power the communicator.
l
The communicator must be connected to a UL-listed control panel with power limited circuits.
l
Installation and Operation Manual | REV. B
13
Wednesday, February 28, 2024

Advertisement

Table of Contents
loading

Table of Contents