Checking The Installation.6-14 - Furuno 1751 Operator's Manual

Hide thumbs Also See for 1751:
Table of Contents

Advertisement

6. INSTALLATION
ChQCking thø installation
Figure 6-14 Right-side View of Display Unit
Checking the Installation
After installing the unit check it for proper installation by using the checklist below.
Table 6-2 Installation Checklist
Tick here.
□ The cable entry on the scanner housing is on the side of the stem (for standard mounting)
or bow (for alternative mounting) direction correctly. F'or the latter, move the position of
the magnet inside the scanner unit.
□ Four scanner housing fixing bolts are fully tightened.
□ The connection cable is waterproofed at the scanner base.
□ The cable is securely retained against the mast or mounting and is free of interference
from running rigging.
□ Check that the cable giand or entry on the deck is waterproofed, if provided.
□ The power connections to the battery are of correct polarity.
D Check that the plugs at the rear of the display are inserted correctly and are seciire.
□ Check that fuse F1351 on the rear panel is lOA (for 12VDC) or 5A (for 24/32VDC). If the
input voltage is changed from 12VDC to 24/32VDC in the field, change the fuse.
6-14

Advertisement

Table of Contents
loading

Table of Contents