Heatilator Birmingham BIR42-B Installation Manual page 17

Woodburning fireplace
Hide thumbs Also See for Birmingham BIR42-B:
Table of Contents

Advertisement

C. Termination Requirements
,QVWDOO D FDS DSSURYHG DQG OLVWHG IRU WKLV ¿UHSODFH V\VWHP
/RFDWH FDS ZKHUH LW ZLOO QRW EHFRPH SOXJJHG E\ VQRZ RU RWKHU PDWHULDOV
/RFDWH FDS DZD\ IURP WUHHV RU RWKHU VWUXFWXUHV
7KH ERWWRP RI WKH WHUPLQDWLRQ FDS PXVW EH DW OHDVW  IW  P DERYH WKH URRI $1' DW OHDVW  IW  P DERYH DQ\ SRUWLRQ
RI URRI ZLWKLQ  IW  P 
7KH GLVWDQFH UHTXLUHG EHWZHHQ FDSV LV VKRZQ EHORZ
Slanted Roofs
Chimney must
extend 3 ft (.9 m)
above the roof
Flat Roofs
Chimney must
extend 3 ft (.9 m)
above the roof
Multiple Chimney Locations
A
6 in. (minimum) up to 20 in.
152 mm/508 mm
20 in. and over
Figure 4.3
Multiple Chimney Locations
Heatilator • Birmingham 42-B Installation Manual • 4059-715 • Rev AD • 06/23
Chimney must extend 2 ft (.6 m)
above any portion of the roof or
adjacent structures within
10 ft (3 m) of the chimney
B
18 in. minimum
457 mm
0 in. minimum
Gas
Termination
Cap **
*
If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.
**
In a staggered installation with both gas and wood terminations, the
wood termination cap must be higher than the gas termination cap.
Chimney must extend 2 ft (.6 m)
above any portion of the roof or
adjacent structures within
10 ft (3 m) of the chimney
Gas, Wood or Fuel Oil
Termination Cap
B
A *
Wood
Minimum
(See
illustration
above)


Advertisement

Table of Contents
loading

This manual is also suitable for:

Birmingham bir42

Table of Contents