Carrier 59TP6C Installation, Start-Up, Operating And Service And Maintenance Instructions page 42

Two-stage, non-communicating, variable 25-speed, ecm multipoise, condensing gas furnace with intelisense
Table of Contents

Advertisement

59TP6C: Installation, Start-up, Operating and Service and Maintenance Instructions
knockout or plug for the vent pipe and the other knockout or plug for the
combustion air connection. See
The vent elbow can be rotated to the required location on the casing if
necessary. See
Fig.
53. To rotate the vent elbow:
1. Loosen the clamp on the inlet of the vent elbow attached to the
inducer.
2. Rotate the vent elbow to the required position. There are rounded
notches on the vent elbow to align it with the inducer housing for
each orientation.
3. Tighten the clamp around the vent elbow. Torque the clamp to 15
lb-in. See
Fig. 54
through
Use 45 deg. Elbows where
Avoid short horizontal offsets with 90
possible, to ensure conden-
deg. Elbows. Short offsets can be
sate drainage.
difficult to slope and may trap con-
densate.
Fig. 52 – Near Furnace Vent Connections
Fig. 53 – Inducer Vent Elbow
UPFLOW LEFT CONFIGURATION
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
Fig.
15.
Fig.
57.
Slope vent pipe back to the
furnace at least ¼" per foot
UPFLOW RIGHT CONFIGURATION
A14546
Fig. 54 – Upflow Configuration (Appearance May Vary)
See "Notes for Venting Options"
A170006
DOWNFLOW LEFT CONFIGURATION
A230010
DOWNFLOW RIGHT CONFIGURATION
42
UPFLOW VERTICAL VENT
Rotate vent elbow to
3
required position.
2
5
4
5
1
6
7
A230009
A230011
A11311A
A230013

Advertisement

Table of Contents
loading

Table of Contents