Install the AC Power Cables

g. Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your

Install the AC Power Cables

Note
To install the AC power cables in the power supply slots:
1. Plug the power supply cord in to the power supply module.
2. Wrap the tie around the power supply cord.
3. Ensure that the power supply cord is secured to the power supply module.
4. Tighten the tie around the power supply cord as shown.
5. Ensure that the power cord is secured always to a cable support to ensure the cable load doesn't act on
the PSU.
Figure 23: Attach the AC Power Cables
Note
Hardware Installation Guide for Cisco 8011-2X2XP4L PLE Service Endpoint Router
40
site to ensure adequate earth ground.
A dual pole breaker is needed for the installation. The rating of the dual pole breaker for 110V is 20A and for
220V is 6A. The minimum cable size is 14AWG for 110V and 16AWG for 220V.
These images are for representation purpose only. Certain Cisco 8010 Series Routers may not include a tie
for the power supply cord.
Install the Device

Advertisement

Table of Contents
loading

Table of Contents