Preparing The Opening; Overall Cooktop Dimensions - GE PGP976 Installation Instructions Manual

36” sealed gas cooktop
Hide thumbs Also See for PGP976:
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
PREPARING THE OPENING
[1] MAINTAIN THE FOLLOWING
MINIMUM CLEARANCE DIMENSIONS
13" MAX. Depth of unprotected
overhead cabinets
R - MIN. clearance
from cutout to right
side wall
Me
in, height
from countertop
to nearest
cabinet on either
side of unit
30" MIN. clearance from
countertop to unprotected
overhead surface
C-MIN.
clearance from
|
cutout torear
|
wall
aie
L- MIN. clearance
from cooktop to left
side wall
"eS
30" or wider
cabinet base
2-1/2" MIN from
cutout to front of
countertop
NOTE: All gas cooktop models require 7/16"
free area below cooktop bottom to combustible
material.
L
R
Cc
PGP976 | 3-3/4"
6"
2-1/4"
PGP986
12°
12"
3-3/8"
CGP650
12°
12"
3-3/8"
ALL HORIZONTAL CLEARANCES MUST BE MAINTAINED
FOR A MINIMUM OF 18" ABOVE THE COOKING SURFACE.
[3] CUTOUT DIMENSIONS OF COUNTERTOP
To ensure accuracy, it is best to make a template
when cutting the opening in the counter.
19-1/8" width cut
a
33-7/8"
=
length ~ ~Q<_ 16-15/16"
of
EE
[4 | RECOMMENDED GAS SUPPLY
LOCATION FROM BACKWALL
1" Min. From Backwall
[2] OVERALL COOKTOP DIMENSIONS
sen
ot
,
33-11/16"
18-7/8
al
[5] MAKE SURE WALL COVERINGS,
COUNTERTOP AND CABINETS
AROUND COOKTOP CAN
WITHSTAND HEAT (UP TO 200°F)
GENERATED BY COOKTOP
Wall covering,
; cabinets and
| countertop must]
I
|
I
[
withstand heat
|
up to 200°F

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pgp986Cgp650Cgp650set1ssPgp986set1ss

Table of Contents