To Connect The Refrigerant Branching Kit; Checking The Refrigerant Piping; About Checking The Refrigerant Piping; Checking Refrigerant Piping: General Guidelines - Daikin VRV 5 RXYA8A7Y1B Installation And Operation Manual

Hide thumbs Also See for VRV 5 RXYA8A7Y1B:
Table of Contents

Advertisement

15 Piping installation
▪ Make sure that the total length of the piping connected to the joint
is absolute straight for more than 500 mm. Only if a straight field
piping of more than 120 mm is connected, more than 500 mm of
straight section can be ensured.
15.2.7

To connect the refrigerant branching kit

For installation of the refrigerant branching kit, refer to the installation
manual delivered with the kit.
▪ Mount the refnet joint so that it branches either horizontally or
vertically.
▪ Mount the refnet header so that it branches horizontally.
b
a
A
a
B
a
Horizontal surface
b
Refnet joint mounted vertically
c
Refnet joint mounted horizontally
d
Header
15.3

Checking the refrigerant piping

15.3.1

About checking the refrigerant piping

No
Refrigerant piping works are
finished?
Yes
The indoor units / SV units /
No
outdoor unit are already
powered ON?
Yes
Use procedure:
"Method 2: after power ON"
It is very important that all refrigerant piping work is done before the
units (outdoor, SV unit or indoor) are powered on. When the units
are powered on, the expansion valves will initialise. This means that
the valves will close.
Installation and operation manual
34
c
d
Finish piping work
Use procedure:
"Method 1: Before power ON
(regular method)"
NOTICE
Leak test and vacuum drying of field piping, SV units and
indoor units is impossible when field expansion valves are
closed.
Method 1: Before power ON
If the system has not yet been powered on, no special action is
required to perform the leak test and the vacuum drying.
Method 2: After power ON
If the system has already been powered on, activate setting [2‑21]
(refer to
"18.1.4  To access mode 1 or
open field expansion valves to guarantee a refrigerant piping
pathway and make it possible to perform the leak test and the
vacuum drying.
DANGER: RISK OF ELECTROCUTION
NOTICE
Make sure that all indoor units and SV units connected to
the outdoor unit are powered on.
NOTICE
Wait to apply setting [2‑21] until the outdoor unit has
finished the initialisation.
Leak test and vacuum drying
Checking the refrigerant piping involves:
▪ Checking for any leakages in the refrigerant piping.
▪ Performing vacuum drying to remove all moisture, air or nitrogen
in the refrigerant piping.
If there is a possibility of moisture being present in the refrigerant
piping (for example, water may have entered the piping), first carry
out the vacuum drying procedure below until all moisture has been
removed.
All piping inside the unit has been factory tested for leaks.
Only field installed refrigerant piping needs to be checked.
Therefore, make sure that all the outdoor unit stop valves are firmly
closed before performing leak test or vacuum drying.
NOTICE
Make sure that all (field supplied) field piping valves are
OPEN (not outdoor unit stop valves!) before you start leak
test and vacuuming.
For more information on the state of the valves, refer to
"15.3.3 Checking refrigerant piping:
15.3.2
Checking refrigerant piping: General
guidelines
Connect the vacuum pump through a manifold to the service port of
all stop valves to increase efficiency (refer to
Setup" [ 4  35]).
refrigerant piping:
NOTICE
Use a 2-stage vacuum pump with a non-return valve or a
solenoid valve that can evacuate to a gauge pressure of
–⁠ 1 00.7 kPa (−⁠ 1 .007 bar).
NOTICE
Make sure the pump oil does not flow oppositely into the
system while the pump is not working.
NOTICE
Do NOT purge the air with refrigerants. Use a vacuum
pump to evacuate the installation.
2"  [ 4   46]). This setting will
Setup" [ 4  35].
"15.3.3  Checking
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P739915-1 – 2023.12

Advertisement

Table of Contents
loading

Table of Contents