Download Print this page

Rinnai Sapphire RIB2310 Installation

Advertisement

Quick Links

Item Qty. Description
1
1
ZC box base
2
2
ZC box side
3
1
ZC box top
4
1
ZC box rear
5
1
ZC spigot guide plate
6
2
Guide rail flue adaptor
7
1
Air duct outlet gasket
8
1
Spigot top assembly
9
1
Spigot rear
10
2
Edge protector white
11
31
Screw 8x10 AB zinc
12
2
Rivet pop plain73 AS 4.2
Important
To ensure the spigot assembly lines up correctly inside the enclosure and that the
appliance is installed flush, the front edge of the zero clearance box should sit flush
with the front edge of the cladding surface.
The drywall drops down to the level indicated by the two arrows either side of the box.
Before installation:
• Unpack the assembly and check for damage—DO NOT install any damaged items
• Check all components have been supplied
• Read these instructions to get an overview of the steps required before starting the
installation
Failure to follow these instructions could cause the appliance to malfunctionw. This could result
in serious injury and property damage.
Rinnai New Zealand Ltd.
Rinnai Australia Pty. Ltd.
RIB2310/RIB2311 Sapphire/Neo
Zero Clearance Box assembly (R2340)
6
12
0800 746 624
1300 555 545
5
8
2
9
10
1
1
RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly
3
11
7
4
2
10
11955-G 07-16

Advertisement

loading

Summary of Contents for Rinnai Sapphire RIB2310

  • Page 1 Screw 8x10 AB zinc Rivet pop plain73 AS 4.2 Important To ensure the spigot assembly lines up correctly inside the enclosure and that the appliance is installed flush, the front edge of the zero clearance box should sit flush with the front edge of the cladding surface. The drywall drops down to the level indicated by the two arrows either side of the box. Before installation: • Unpack the assembly and check for damage—DO NOT install any damaged items • Check all components have been supplied • Read these instructions to get an overview of the steps required before starting the installation Failure to follow these instructions could cause the appliance to malfunctionw. This could result in serious injury and property damage. Rinnai New Zealand Ltd. 0800 746 624 RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly Rinnai Australia Pty. Ltd. 1300 555 545 11955-G 07-16...
  • Page 2 Assemble flue spigot, and rivet from the underside, the spigot guide plate provided in the zero clearance box kit to the spigot assembly. When this spigot is used with the zero clearance box these dimples are to be drilled at Ø3.2 Rinnai New Zealand Ltd. 0800 746 624 RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly Rinnai Australia Pty. Ltd. 1300 555 545...
  • Page 3 2. Assemble base, sides and rear panel of zero clearance box Lie the base panel on the floor and using the screws provided in the assembly pack, screw the side panels to the base and then attach the rear panel. 3. Attach full spigot assembly and top panel Drill out the two 3.3 mm holes in the spigot where the two dimples are located. Screw the full spigot assembly to the back panel of the zero clearance box (though the back of box) and attach the top panel. Rinnai New Zealand Ltd. 0800 746 624 RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly Rinnai Australia Pty. Ltd. 1300 555 545 11955-G 07-16...
  • Page 4 Top of Neo engine 5. Apply edge protector Apply white edge protectors provided in the assembly pack to the gas and electrical access holes. 6. Guide rails Guide rails (number 6 on front page) need to be attached to the top of the Neo engine as shown. Spigot guide plate Guide rails Rinnai New Zealand Ltd. 0800 746 624 RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly Rinnai Australia Pty. Ltd. 1300 555 545 11955-G 07-16...

This manual is also suitable for:

Neo rib2311