Pressures Test - Bosch ACS 763 Manual

Hide thumbs Also See for ACS 763:
Table of Contents

Advertisement

en
70 | ACS 763/863 | Instructions for use
22. The station generates a vacuum in the A/C system
for the programmed time interval.
« After the vacuum has been carried out, the sta-
tion performs a pressure test for 5 minutes
(only for ACS 863-OE). A small amount of re-
frigerant is charged and recovered through the
flushing circuit, while the station constantly
checks for any pressure loss inside the system.
23. After a small charge, the refrigerant charged is
recovered through the low pressure service hose.
24. The operation 23 is repeated three more times to
ensure an effective system flushing.
« After completing the fourth cycle, the station au-
tomatically drains oil.
« When the oil drain is complete, the station dis-
plays the total amount of oil discharged during
the process.
25. After successfully completing the flushing and after
reassembling the A/C system, replace the oil lost
during the process.
26. For further instructions, refer to the vehicle
maintenance manual.
27. Select
to return to the Functions Menu.
|
SP00D00490
2020-01-08
6.11

Pressures test

To check if the system is efficient, check the pressures
in the system as follows:
1. Call up the Main Menu.
2. Select
.
3. Select
.
4. Select Functions.
5. Select A/C Perfomance Test.
6. Enter the service data and confirm with
(see chapter 6.1).
« ACS 763/863 displays a dedicated message that
indicates to the operator the procedures to be
performed to start the test.
i
It is possible not to perform the test with
directly to phase 12 displaying.
7. Connect the high pressure (red) and low pressure
(blue) service hose to the vehicle A/C system.
8. Open the valves of the service hose connections
turning the ring nuts clockwise.
9. Turn on the vehicle and the A/C system on the
vehicle.
10. Select
to continue.
i
Wait for the stabilization of the pressures and read
the high pressure value displayed on the respective
pressure gauge.
11. Enter the high pressure reading value and the air
temperature value of the air vents in the appropriate
fields. Confirm with
i
Select
to print the displayed report.
Select
to continue.
12. Follow the instructions displayed and confirm with
13. Turn off the A/C system and the vehicle.
14. Close the valves of the service hose connections
turning the ring nuts counter-clockwise.
15. Select
to end.
and go
.
Robert Bosch GmbH
.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs 863

Table of Contents