OPERATING PROCEDURE
5. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet and service panel. (Refer to
section 1.)
(2) Remove the back panel. (Refer to section 1.)
(3) Remove the inverter assembly. (Refer to section 2.)
(4) Recover gas from the refrigerant circuit.
NOTE: Recover gas from the pipes until the pressure gauge
shows 0 kg/cm
(5) Detach the brazed part of the suction and the discharge pipe
connected with compressor.
(6) Remove the compressor nuts.
(7) Remove the compressor.
(8) Detach the brazed parts of 4-way valve and pipe. (Photo 11)
Photo 11
OBH767G
(0 MPa).
2
Brazed parts of
4-way valve
PHOTOS/FIGURES
Photo 10
Brazed part of
the discharge pipe
Compressor protector
Figure 1
Attach the compressor
protector to the
protector holder with the
surface on which the
model name is printed
facing the area hatched
in the figure.
101
Brazed part of
the suction pipe
Discharge temperature
thermistor