Installation Instructions; Cartridge Installation - American Standard Aspirations TU06150 Series Manual

Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS

1

CARTRIDGE INSTALLATION

• Remove Plaster Guard (6) (Keep it installed
for thin wall Installation).
• Remove Bonnet Nut (1) by unthreading it
Counter clockwise. Remove test cap (2).
• Remove protective housing (3) from
cartridge (4). Install with "UP" text on top.
• Reinstall BONNET NUT (1) onto VALVE
BODY (5) and tighten firmly with 12 Nm
or 9 lbs/ft.
NOTE: Specified tightening torque of BONNET
NUT (1) is critical to assure sealing function.
2
INSTALL VALVE TRIM (STANDARD WALL INSTALLATION)
• Figure 1. Push CAP (1) over VALVE CARTRIDGE (2) until seated against stop.
• Figure 2. Make sure O-RING (6) is secure within ESCUTCHEON HOLDER (3).
Push ESCUTCHEON HOLDER (3) onto CAP (1) and attach with
LONG SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to
ESCUTCHEON HOLDER (3) with 4 SHORT
SCREWS (8).
• Figure 3. Install ESCUTCHEON (7) onto
CAP (1) and push flush against finished wall.
Escutcheon (7) will snap fit onto ESCUTCHEON
SUPPORT (5).
1
6
B
Figure 1.
3
5
8
4
Figure 2.
Figure 3.
5
1
3
2
PLASTER
GUARD
1
5
4
6
1
2
7

Advertisement

Table of Contents
loading

Table of Contents