Hide thumbs Also See for RXM25A5V1B:
Table of Contents

Advertisement

Quick Links

Installation manual
R32 split series
RXM20A5V1B
RXM25A5V1B
RXM35A5V1B
RXM42A5V1B
Installation manual
ARXM25A5V1B
English
R32 split series
ARXM35A5V1B

Advertisement

Table of Contents
loading

Summary of Contents for Daikin RXM25A5V1B

  • Page 1: Table Of Contents

    Installation manual R32 split series RXM20A5V1B RXM25A5V1B RXM35A5V1B RXM42A5V1B Installation manual ARXM25A5V1B English R32 split series ARXM35A5V1B...
  • Page 2 4P687305-26G...
  • Page 3 4P690931-23D...
  • Page 4 4P697463-12D...
  • Page 5 4P697463-12D...
  • Page 6 4P692832-23G...
  • Page 7 4P692832-23G...
  • Page 8: Table Of Contents

    Unified wiring diagram legend........18 Daikin website (publicly accessible). 13.2 Piping diagram ................19 ▪ The full set of the latest technical data is available on the Daikin 13.2.1 Piping diagram: Outdoor unit ........19 Business Portal (authentication required). Installation manual...
  • Page 9: Specific Installer Safety Instructions

    2 Specific installer safety instructions DANGER: RISK OF EXPLOSION Specific installer safety Do NOT open the stop valves before the vacuum drying is instructions finished. Always observe the following safety instructions and regulations. refrigerant" [ 4  14]) Charging refrigerant (see "6 Charging installation" [ 4  11]) Unit installation (see "4 Unit...
  • Page 10: About The Box

    3 About the box WARNING DANGER: RISK OF ELECTROCUTION Use an all-pole disconnection type breaker with at least Disconnect the power supply for more than 10  minutes, 3  mm between the contact point gaps that provides full and measure the voltage at the terminals of main circuit disconnection under overvoltage category III.
  • Page 11: Unit Installation

    4 Unit installation Outdoor unit installation manual 4.1.2 Additional installation site requirements Fluorinated greenhouse gases label of the outdoor unit in cold climates Multilingual fluorinated greenhouse gases label Drain plug (located on the bottom of the packing case) Protect the outdoor unit against direct snowfall and take care that the Drain cap (1) Drain cap (2) outdoor unit is NEVER snowed up.
  • Page 12: To Install The Outdoor Unit

    5 Piping installation Drain port Bottom frame Drain plug Hose (field supply) To close the drain holes and attach the drain socket NOTICE In cold areas, do NOT use a drain socket, hose and caps (1, 2) with the outdoor unit. Take adequate measures so that the evacuated condensate CANNOT freeze.
  • Page 13: Refrigerant Piping Insulation

    5 Piping installation Depending on the applicable legislation and the maximum NOTICE working pressure of the unit (see "PS High" on the unit name ▪ Use the flare nut fixed to the unit. plate), larger piping thickness might be required. ▪...
  • Page 14: Charging Refrigerant

    6 Charging refrigerant If the pressure… Then… WARNING Does not change There is no moisture in the ▪ Do NOT pierce or burn refrigerant cycle parts. system. This procedure is ▪ Do NOT use cleaning materials or means to accelerate finished.
  • Page 15: To Fix The Fluorinated Greenhouse Gases Label

    7 Electrical installation Tightness test of field-made refrigerant joints indoors WARNING 1 Use a leakage test method with a minimum sensitivity of 5 g of If the supply cord is damaged, it MUST be replaced by the refrigerant/year. Test leaks using a pressure of at least 0.25 manufacturer, its service agent or similarly qualified times the maximum working pressure (see "PS High"...
  • Page 16: To Connect The Electrical Wiring To The Outdoor Unit

    Next commissioning instructions in this chapter, a general commissioning checklist is also available on the Daikin Business Portal (authentication required). The general commissioning checklist is complementary to Interconnection cable the instructions in this chapter and can be used as a...
  • Page 17: Checklist During Commissioning

    LED is… Diagnosis maintenance/inspection checklist is also available on the flashing Normal. Daikin Business Portal (authentication required). ▪ Check the indoor unit. general maintenance/inspection checklist ▪ Turn the power OFF and back ON, and...
  • Page 18: Disposal

    ▪ A subset of the latest technical data is available on the regional Daikin website (publicly accessible). Light emitting diode (service monitor green) ▪ The full set of the latest technical data is available on the Daikin Business Portal (authentication required). HIGH VOLTAGE High voltage Intelligent eye sensor 13.1...
  • Page 19: Piping Diagram

    13 Technical data Symbol Meaning Piping diagram legend Thermostat Liquid stop valve S*RH Humidity sensor Gas stop valve S*W, SW* Operation switch Refnet SA*, F1S Surge arrester SR*, WLU Signal receiver Selector switch Muffler SHEET METAL Terminal strip fixed plate Transformer Muffler with filter TC, TRC...
  • Page 20 DAIKIN ISITMA VE SOĞUTMA SİSTEMLERİ SAN.TİC. A.Ş. Gülsuyu Mahallesi, Fevzi Çakmak Caddesi, Burçak Sokak, No:20, 34848 Maltepe İSTANBUL / TÜRKİYE Tel: 0216 453 27 00 Faks: 0216 671 06 00 Çağrı Merkezi: 444 999 0 Web: www.daikin.com.tr 3P645642-7N 2023.11 Verantwortung für Energie und Umwelt...

This manual is also suitable for:

Rxm20a5v1bRxm35a5v1bRxm42a5v1bArxm25a5v1bArxm35a5v1b

Table of Contents