Start Up; Economizer Start-Up; Compressor Start-Up - Trane Voyager TS 150F Series Installation, Operation And Maintenance Manual

Packaged rooftop air conditioners
Table of Contents

Advertisement

Start Up

Economizer Start-Up

Using the Service Test Guide in
jump across the Test 1 and Test 2 terminals on LTB1 one-
time to start the Minimum Ventilation Test.
1. Set the minimum position setpoint for the economizer
to the required percentage of minimum ventilation
using the setpoint potentiometer located on the
Economizer Control (ECA).
The economizer will drive to its minimum position
setpoint, exhaust fans (if applicable) may start at
random, and the supply fan will start when the
SERVICE TEST is initiated.
The Exhaust Fan will start anytime the economizer
damper position is equal to or greater than the exhaust
fan setpoint.
2. Verify that the dampers stroked to the minimum
position.
3. Momentarily jump across the Test 1 and Test 2
terminals on LTB one additional time if continuing
from previous component start-up or until the desired
start-up component Test is started.
4. Verify that the dampers stroked to the full open
position.
5. To stop the SERVICE TEST, turn the main power
disconnect switch to the "Off" position or proceed to
the next component start-up procedure. Remove
electro mechanical test mode connections (if
applicable).

Compressor Start-Up

1. Attach a set of service gauges onto the suction and
discharge gauge ports for each circuit. Refer to the
refrigerant circuit illustration in the Service Facts.
Using the Service Test Guide in
the Service Test start-up procedure for each
compressor circuit.
Momentarily jump across the Test 1 and Test 2
terminals on LTB1 one additional time if continuing
from previous component start-up or until the desired
startup component Test is started.
Scroll Compressors
a. Once each compressor has started, verify that the
rotation is correct. If wired correctly the suction
pressure should drop and the discharge pressure
should rise. If a scroll compressor is rotating
backwards, it will not pump and a loud rattling
sound can be observed.
b. If the electrical phasing is correct, before
condemning a compressor, interchange any two
leads (at the compressor Terminal block) to check
the internal phasing. Refer to the following
36
Table 8, p.
35, momentarily
Table 8, p.
35, continue
illustration for the compressor terminal/phase
identification. Do not allow the compressor to
operate backwards for more than 5 seconds.
Operation for a period of time longer than this will
result in compressor damage. Copeland (Alliance)
will experience failure also. If the compressor runs
backward for an extended period, the motor
winding can overheat and cause the motor winding
thermostat to open.
Figure 27.
Compressor terminal box
Note: The Copeland, SSA and SPA scroll compressors for
R-410A units use Trane OIL00094. The correct Oil
for Trane CSHD is Trane OIL00079 or OIL00080.
Compressor types are listed in
appropriate oil charge is listed in
Table 9.
Compressor types
To n n a g e
C1
TS* 150
SSA067
TH* 150
SSA076
TH* 150 Reheat
SSA067
TS* 180/ 155
CSHD105
TH* 180
CSHD089
TH* 180 Reheat
SSA083
TS* 210/ 175
CSHD120
TH* 210
CSHD105
TH* 210 Reheat
CSHD089
TS* 240/ 200
CSHD142
TH* 240
CSHD142
TH* 240 Reheat
CSHD120
TS* 300/ 250
CSHD120
TH* 300
CSHD155
Table 9, p.
36. The
Table 10, p.
37.
C2
SSA054
SPA044
SSA067
SPA050 ( SPA054 on 380V/ 60Hz/ 3Ph
unit s only)
SSA057
SSA083
SPA044 ( SPA054 on 380V/ 60Hz/ 3Ph
unit s only)
SSA057
SSA083
SSA083
SSA083
CSHD120
CSHD120
SSA083
RT-SVX25G-EN

Advertisement

Table of Contents
loading

Table of Contents