Download Print this page

Rinnai Pure Control Installation & User Manual page 4

Auto pasteurisation unit

Advertisement

FUNCTIONALITY OF THE PURE
Functionality of The Pure
This System and Instructions must be used and applied in conjunction
with Health and Safety Executive ACOP L8 The Control of Legionella
Bacteria as well as any Local by-Laws
The Rinnai PURE system is designed to allow a domestic hot water system fitted
with a secondary return system to operate during the buildings occupancy at a safe
temperature whilst also allowing the temperature to be raised during periods of
un-occupancy to reduce the growth of legionella bacteria.
The Pure Controller works in conjunction with the MC91 controller and the
temperature setting of the dipswtiches on the water heater. The secondary return
pump is wired through the Pure to allow it to turn the pump on and off.
The Pure has 4 different schedule settings that can be programmed in to it which
can be set over 7 days and it also has a cool down period which can be set from 15
minutes to 300 minutes. The 4 different settings are as follows
Occupancy On—Building Occupied
Occupancy Off– Building Unoccupied
Pasteurisation On– Pasteurisation Starts
Pasteurisation Off—Pasteurisation Finished.
The cool down period does not let you programme an occupied setting until after
the desired duration that is set.
The Pure also utilises and Temperature sensor which is to be fitted directly on to
the return pipework or the inlet leg to the water heater. This temperature can be
altered when the building is occupied and when it reaches its set pump will turn the
secondary pump off.
NOTE IT IS THE INSTALLERS RESPONSIBILITY TO ENSURE THAT THE
SYSTEM HAS BEEN REDUCED TO A SAFE TEMPERATURE PRIOR to THE
RE-OCCUPANCY, FAILURE TO DO SO COULD LEAD TO PERSONEL INJURY.
4

Advertisement

loading