Download Print this page

Rinnai Pure Control Installation & User Manual page 12

Auto pasteurisation unit

Advertisement

OPERATIONAL COMPONENTS
Edit Default Set Points:
To edit the default set points for the Occupancy and Pasteurisation cycles press all four buttons on the
PURE controller to enter the maintenance menu, navigate to Global Setting and select either the 'Temp
Occ SP' to adjust the occupied default set point or 'Pas SP' to adjust the pasteurisation set point.
Time Schedule set up:
To enter the time scheduling press the top right button on the PURE controller. The below screen will
show:
Time Update (Manual / System):
This allows the user to set the date manually (manual) or over the network (system).
DST (Yes/No):
This allows the user to select Daylight Saving Time. DST is only available when manually updating the time.
Set Date and Time:
The user can set the correct time and date.
Set Event:
The user can set their events within the time schedule. The events include:
Occupancy ON – When an occupied period will begin.
Occupancy OFF – When an occupied period will end.
Pasteurisation ON – When a pasteurisation period will begin.
Pasteurisation OFF – When a pasteurisation period will end.
Note: A pasteurisation period cannot be set between an occupied ON and occupied OFF period. An occupancy
ON cannot be set until after a Pasteurisation OFF + Cooling down period.
CAL-Off
CAL-On
Cool Down:
This is the minimum time the controller will allow between Pasteurisation Cycle and an Occupied Cycle. This
is adjustable by the user and should be set before any time scheduling events are programmed. If the cool
down period is edited all time programmed events will be reset.
Programing Instructions
Scheduler
1
Time Update
2
DST
3
Set Date and Time
4
Set Event
5
CAL-Off
6
CAL-On
7
Cool Down
8
Return to previous
12

Advertisement

loading