1.4 Change Control
ECR/ECN
1.5 Service
Documentation / Service Manual
All Engineering changes to the product shall be made in
accordance with the WoosungNextier Corp. ECR/ECN
Procedure
Complete Spare Parts List, Schematic, Service Manual, and
Assembly Drawings shall be provided within one month of
Mass Production Release.
13/185