Mitsubishi Electric HYBRID CITY MULTI PURY-M200-300YNW-A Data Book page 65

Table of Contents

Advertisement

3. Installation flow chart
Two safety
measures: alarm
and ventilation required by
applicable regulations, are
installed additionally.
YES
Installation OK
Installation OK
(12) Ceiling space installation
(Circulation+Alarm+
Ventilation)
Mechanical
ventilation system required by
applicable regulations is installed
additionally.
YES
Installation OK
Installation OK
(15) Small room installation
(Circulation+Mechanical
ventilation)
MEES18K044
Two safety
measures: shut-off
NO
valves and ventilation required
by applicable regulations, are
installed additionally.
YES
Installation OK
Installation OK
(13) Small room installation
(Circulation+Shut-off
valves+Ventilation)
NO
Installation
Installation
not allowed
not allowed
<Mechanical
ventilation
requirement>
IEC/GG.11.3
ISO/part3-6.3.3
Small room
installation
NO
Installation
Installation
not allowed
not allowed
SAFETY HANDLING FOR R32
7

Advertisement

Table of Contents
loading

Table of Contents