EVM Setup
3.2 Test Points
Table 3-1
lists the test points for the UA78LEVM-075.
TEST POINT
TP1
TP2
TP3
TP4
3.3 Soldering Guidelines
To avoid damaging the LDO, use a hot-air system for any solder rework to modify the EVM for the purpose of
repair or other application reasons.
4 Equipment Connection and Operation
Connect test equipment as described in this section and follow the listed steps to properly take measurements.
1. Verify that the input voltage power supply is set from 4.75 V to 20 V
2. Connect the anode of the power supply to J1 (VIN) and the cathode to J7 (GND)
3. Connect the anode of the load to J2 (VOUT) and the cathode to J8 (GND)
4. Turn on the power supply
5. Vary VIN and the load as necessary for testing purposes
4
UA78LEVM-075 Evaluation Module
Table 3-1. Test Point Functions
NAME
VIN
Unregulated DC input
VOUT
Regulated DC output
GND
Device GND
Copyright © 2022 Texas Instruments Incorporated
DESCRIPTION
SLVUCG1 – DECEMBER 2022
Submit Document Feedback
www.ti.com