Fujitsu PRIMERGY RX2520 M1 Operating Manual page 76

Hide thumbs Also See for PRIMERGY RX2520 M1:
Table of Contents

Advertisement

Starting up and operation
Ê Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 80
installing the operating system without the ServerView Installation
Manager" on page
– System already installed:
Ê Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for
several minutes.
Switching the server off
The Power-on indicator (see figure
Ê Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The power-
on indicator lights up orange. With the 3.5-inch system variant the Power-on
indicator lights up green.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
– Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S4, you can configure
that the server is switched on/off controlled by an internal timer.
– Ring indicator
The server is switched on by an internal or external modem.
– Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet™).
76
or section
81).
7 on page
Operating Manual
"Configuring the
"Configuring the server and
60) lights up green.
RX2520 M1

Advertisement

Table of Contents
loading

Table of Contents