Mitsubishi Electric MCFH-A24WV Installation Manual page 5

Floor and ceiling type air-conditioner
Hide thumbs Also See for MCFH-A24WV:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
4-1-(2)
FIXING OF INSTALLATION PLATES
1. Set installation plates to installation plate fixing bolts.
• Set installation plates 1 to installation plate fixing bolts J
so that the distance between insides of installation plates
is adjusted to length as shown in the right.
1 Installation plate
• Installation plates 1 should be fixed on one way direction,
as shown in Fig. 1.
Don't fix as shown in Fig. 2.
• Be sure to confirm letters "FRONT" in installation plates 1,
set "FRONT" side to air outlet side of indoor unit.
a "FRONT"
1 Installation plate
2. In case of fixing installation plates 1 above the ceiling, put
installation plates fixing bolt through a nut, a spring washer,
the installation plate, a spring washer, and double nut. (Fig. 3)
In case of fixing installation plates 1 forward the ceiling
directly, also put installation plate fixing bolt through the in-
stallation plate, a spring washer, and double nuts. (Fig. 4)
a Ceiling
K-1
Nut (M10)
K-2
1 Installation plate
Spring washer
J Installation plate fixing bolt
K-3
Double nut (M10)
3. Check that the four corners are horizontal with level gauge.
(Fig. 5)
a Level gauge
4-1-(3)
DRILLING HOLE
Determine the locations of holes for refrigerant pipe A and drain
pipe D.
• Use the installation pattern as mentioned in 4-1-(1).
• Be sure to confirm the dimensions as shown in the right.
a Horizontal base line
b Hole for refrigerant pipe
c Hole for drain pipe
1 Installation plate
• Specially, drill the hole for drain pipe with designate dimen-
sion to keep an inclination.
d Horizontal base line
e Hanging bolt
f Wall
1
1028 mm
1
a
(Fig. 1)
(Fig. 2)
a
a
J
1
K-1
K-2
K-2
K-3
J
1
K-2
K-3
(Fig. 3)
(Fig. 4)
a
(Fig. 5)
a
0
b
1
115
c
188
(unit : mm)
d
FRONT
e
f
(unit : mm)
5
4-1-(4)
FRONT GRILLE REMOVAL
• Remove front grille and transportation support.
Remove 3 screws
Front grille
4-1-(5)
OPENING KNOCKOUT HOLE
• Remove knockout holes with hammering it.
4-1-(6)
FIXING UNIT TO INSTALLATION PLATES
1. Suspending unit from installation plates.
• Hoist unit so that hanging bolt (4) on the sides of unit fit into holes in installation plates 1.
Unit fixing screw 2
Hanging bolt
FRONT
2. Securing unit to installation plates.
• Be sure to tighten unit fixing screw 2 to unit securely.
Transportation support
* After installing com-
pletely, please remove
this part because this is
used for transportation
only.
Knockout hole
Knockout hole for drain pipe
Unit fixing screw 2
• Be sure to set hanging bolt
in this position to keep
unit's inclination.

Advertisement

Table of Contents
loading

Table of Contents