Download Print this page

Kohler BRAZN K-EX22381T-SL Installation Instructions Manual page 6

Floor standing toilet

Advertisement

TO CONNECT WATER
SUPPLY
* Flexible hose are recommended to
connect the supply line to the fill valve.
If you use a rigid connection(not
provided), take care not to apply side
forces to the bottom of the fill valve. Be
sure the rigid connection must be fit
with supply line completely to prevent
damage shank by forced connection.
IMPORTANT:
Before turning on the supply valve for the first
time, follow the steps below to clear sand, debris and rust
from the system:
Make sure water supply is off. Remove valve END by
rotating it 1/8 turn counterclockwise.
While holding a container over the uncapped VALVE to
prevent splashing, turn water supply on and off a few times.
Leave water supply off.
Replace END by engaging lugs and rotating 1/8 turn
clockwise.
Make certain the top is turned to the locked
position. Valve may not turn on if top is not fully in the
locked position.
Turn on water supply. Check that water level is at the marked
water line.
Install the tank lid and the seat. Use
the supplied hardware pack for seat.
Periodically check for leaks for several
days following the installation.
Connect the push button and flush
valve.
1486239-T01-A
Supply Shank*
Supply Shut-Off Valve
Fig.#13
13
Fig.#14
14
-6-
)
1/8
1/8
(

Advertisement

loading

This manual is also suitable for:

Brazn k-ex22381t-nsBrazn k-ex22381t-hcBrazn k-ex22384t-slBrazn k-ex22384t-nsBrazn k-ex22384t-hc