Summary of Contents for Siemens Sicharge Uc 8EM4 Series

  • Page 2 Preventive Maintenance Checklist for SICHARGE UC Introduction SICHARGE UC Charger SICHARGE UC Dispenser SICHARGE UC MastHood Preventive Maintenance Checklist SICHARGE UC MastPanto for SICHARGE UC Appendix Product Information 02/2023 A5E52548311-AA...
  • Page 3 Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
  • Page 4: Table Of Contents

    Table of contents Introduction ............................4 SICHARGE UC Charger ..........................5 Preventive Maintenance Checklist ..................5 SICHARGE UC Dispenser ........................7 Preventive Maintenance Checklist ..................7 SICHARGE UC MastHood ........................9 Preventive Maintenance Checklist ..................9 SICHARGE UC MastPanto ........................11 Preventive Maintenance Checklist ..................
  • Page 5: Introduction

    Introduction The condition of the system and any defects found must be documented with suitable photos. If an inspection point is marked "FAIL (F)", a more detailed description of the defect must be given at the end of the checklist. Criteria that cannot be checked, e.g.
  • Page 6: Sicharge Uc Charger

    SICHARGE UC Charger Preventive Maintenance Checklist Control (annually) Customer: Date: Serial number: Date of manufacture: Location: Name: Checklist item Check the touch screen (HMI) for errors and solve them if possible. ☐ ☐ ☐ Check whether an error message appears on the HMI after opening the cabinet door. ☐...
  • Page 7 SICHARGE UC Charger 2.1 Preventive Maintenance Checklist Checklist item Check for additional country-specific signs ☐ ☐ ☐ Is system documentation (circuit diagrams, product documentation, OEM documentation) ☐ ☐ ☐ available? Check if SW-updates are available ☐ ☐ ☐ Check the tightening torques or mark on nut of the L1, L2, L3 connections - 42,4Nm (when ☐...
  • Page 8: Sicharge Uc Dispenser

    SICHARGE UC Dispenser Preventive Maintenance Checklist Control (annually) Customer: Date: Serial number: Date of manufacture: Location: Name: Checklist item Check touch screen display (HMI) for errors and solve if possible ☐ ☐ ☐ Check whether an error message appears on the touch screen display (HMI) after opening the ☐...
  • Page 9 SICHARGE UC Dispenser 3.1 Preventive Maintenance Checklist Comments and findings: Name Function Signature Responsible person (optional) Customer Please take into consideration that the document is only valid after signatures of technician or if included in the final document delivered to the customer. Preventive Maintenance Checklist for SICHARGE UC Product Information, 02/2023, A5E52548311-AA...
  • Page 10: Sicharge Uc Masthood

    SICHARGE UC MastHood Preventive Maintenance Checklist Control (annually) Customer: Date: Serial number: Date of manufacture: Location: Name: Checklist item Disconnect the MastHood form the Charger MCCB according to the 5 safety rules. Regarding the ☐ ☐ ☐ AC and DC capacitors pay attention to the follow note. Note: After disconnecting the power supply of the SICHARGE UC MastHood and the connected SICHARGE UC charging station, the capacitors in the SICHARGE UC charging station will start discharging.
  • Page 11 SICHARGE UC MastHood 4.1 Preventive Maintenance Checklist Comments and findings: Name Function Signature Responsible person (optional) Customer Please take into consideration that the document is only valid after signatures of technician or if included in the final document delivered to the customer. Preventive Maintenance Checklist for SICHARGE UC Product Information, 02/2023, A5E52548311-AA...
  • Page 12: Sicharge Uc Mastpanto

    SICHARGE UC MastPanto Preventive Maintenance Checklist Control (annually) Customer: Date: Serial number: Date of manufacture: Location: Name: Checklist item Make a visual inspection for external damage ☐ ☐ ☐ Inspect the locks ☐ ☐ ☐ Inspect the hinges ☐ ☐ ☐...
  • Page 13 SICHARGE UC MastPanto 5.1 Preventive Maintenance Checklist Comments and findings: Name Function Signature Responsible person (optional) Customer Please take into consideration that the document is only valid after signatures of technician or if included in the final document delivered to the customer. Preventive Maintenance Checklist for SICHARGE UC Product Information, 02/2023, A5E52548311-AA...
  • Page 14: Appendix

    Appendix Maintenance Plan Table A- 1 SICHARGE UC Installation Commission- Final Customer Preventive Acceptance Maintenance Year From 1 to 15 Interval [yr] UC100C Com- Effort [h] pact Charger Material [€] Tools [€] UC100 Effort [h] Material [€] Tools [€] UC150C Com- Effort [h] pact Charger Material [€]...
  • Page 15 Appendix A.1 Maintenance Plan Table A- 2 SICHARGE UC Dispenser type Installation Commission- Final Customer Preventive Acceptance Maintenance Year From 1 to 15 Interval [yr] Dispenser Effort [h] Material [€] Tools [€] Dispenser LiCo Effort [h] Material [€] Tools [€] Dispenser Roof Effort [h] Mount...