Air Ducts; General; Ductwork Acoustical Treatment; Supply Air Connections - Bryant D Series Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

TABLE 3—MAXIMUM CAPACITY OF PIPE*
NOMINAL
IRON
INTERNAL
PIPE
DIAMETER
SIZE
(IN.)
(IN.)
1/2
0.622
175
3/4
0.824
360
1
1.049
680
1-1/4
1.380
1400
1-1/2
1.610
2100
* Cubic ft of gas per hr for gas pressures of 0.5 psig (14-in. wc) or less, and
a pressure drop of 0.5-in. wc (based on a 0.60 specific gravity gas).
Ref: Table 10-2 NFPA 54-1999.
GAS
SUPPLY
MANUAL
SHUTOFF
VALVE
(REQUIRED)
SEDIMENT
TRAP
UNION
Fig. 21—Typical Gas Pipe Arrangement
CAUTION: If a flexible connector is required or al-
lowed by authority having jurisdiction, black iron pipe
shall be installed at gas valve and extend a minimum of
2 in. outside furnace casing.
An accessible manual shutoff valve MUST be installed upstream
of furnace gas controls and within 6 ft of furnace. A 1/8-in. NPT
plugged tapping, accessible for test gage connection, MUST be
installed immediately upstream of gas supply connection to
furnace and downstream of manual shutoff valve.
NOTE: The gas valve inlet press tap connection is suitable to use
as test gage connection providing test pressure DOES NOT exceed
maximum 0.5 psig (14-in. wc) stated on gas valve. (See Fig. 45.)
Piping should be pressure tested in accordance with local and
national plumbing and gas codes before furnace is attached. In
Canada, refer to current edition of NSCNGPIC. If pressure
exceeds 0.5 psig (14-in. wc), gas supply pipe must be disconnected
from furnace and capped before pressure test. If test pressure is
equal to or less than 0.5 psig (14-in. wc), turn off electric shutoff
switch located on gas valve before test. It is recommended that
ground joint union be loosened before pressure testing. After all
connections have been made, purge lines and check for leakage.

AIR DUCTS

I. GENERAL REQUIREMENTS
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
Air Conditioning Contractors National Association (SMACNA) or
American Society of Heating, Refrigerating and Air Conditioning
Engineers (ASHRAE). Or consult factory The Air Systems Design
Guidelines reference tables available from your local distributor.
The duct system should be sized to handle the required system
design CFM at the design static pressure.
LENGTH OF PIPE (FT)
10
20
30
40
50
120
97
82
73
250
200
170
151
465
375
320
285
950
770
660
580
1460
1180
990
900
A93324
When a furnace is installed so that the supply ducts carry air to
areas outside the space containing the furnace, the return air must
also be handled by a duct(s) sealed to the furnace casing and
terminating outside the space containing the furnace.
Secure ductwork with proper fasteners for type of ductwork used.
Seal supply- and return-duct connections to furnace with code
approved tape or duct sealer.
Flexible connections should be used between ductwork and
furnace to prevent transmission of vibration. Ductwork passing
through unconditioned space should be insulated to enhance
system performance. When air conditioning is used, a vapor
barrier is recommended.
Maintain a 1-in. clearance from combustible materials to supply air
ductwork for a distance of 36 in. horizontally from the furnace. See
NFPA 90B or local code for further requirements.
II. DUCTWORK ACOUSTICAL TREATMENT
Metal duct systems that do not have a 90 degree elbow and 10 ft
of main duct to the first branch take-off may require internal
acoustical lining. As an alternative, fibrous ductwork may be used
if constructed and installed in accordance with the latest edition of
SMACNA construction standard on fibrous glass ducts. Both
acoustical lining and fibrous ductwork shall comply with NFPA
90B as tested by UL Standard 181 for Class 1 Rigid air ducts.
III. SUPPLY AIR CONNECTIONS
Connect supply-air duct to 3/4-in. flange on furnace supply-air
outlet. The supply-air duct attachment must ONLY be connected
to furnace supply-/outlet-air duct flanges or air conditioning coil
casing (when used). DO NOT cut main furnace casing to attach
supply side air duct, humidifier, or other accessories. All accesso-
ries MUST be connected external to furnace main casing.
A. Downflow Furnaces
Connect supply-air duct to supply-air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used), when
installed on non-combustible material. When installed on combus-
tible material, supply-air duct attachment must ONLY be con-
nected to an accessory subbase or factory approved air condition-
ing coil casing. DO NOT cut main furnace casing to attach supply
side air duct, humidifier, or other accessories. All accessories
MUST be connected external to furnace main casing.
B. Horizontal Furnaces
Connect supply-air duct to supply air opening on furnace. The
supply-air duct attachment must ONLY be connected to furnace
supply/outlet or air conditioning coil casing (when used). DO NOT
cut main furnace casing to attach supply side air duct, humidifier,
or other accessories. All accessories MUST be connected external
to furnace main casing.
IV. RETURN AIR CONNECTIONS
A. Upflow Furnaces
The return-air duct must be connected to bottom , sides (left or
right), or a combination of bottom and side(s) of main furnace
casing as shown in Fig. 1. Bypass humidifier may be attached into
unused side return air portion of the furnace casing. DO NOT
connect any portion of return-air duct to back of furnace casing.
B. Downflow and Horizontal Furnaces
The return-air duct must be connected to return-air opening
provided as shown in Fig. 1. DO NOT cut into casing sides or back
to attach any portion of return-air duct. Bypass humidifier connec-
tions should be made at ductwork or coil casing sides exterior to
furnace.
—17—