Trial Operation And Testing; Test Items - Daikin RX09RMVJU9A Installation Manual

Hide thumbs Also See for RX09RMVJU9A:
Table of Contents

Advertisement

[For wireless remote controller]
1) Press
and select the COOL operation.
2) Press
twice. "Test" is displayed.
3) Press
within 10 seconds, and the forced cooling operation starts.
• Forced cooling operation will stop automatically after about 15 minutes.
To stop the operation, press

Trial Operation and Testing

1.
Trial operation and testing
Refer to the installation manual for the indoor unit.
2.

Test items

Indoor and outdoor units are installed securely.
No refrigerant gas leaks.
Refrigerant gas and liquid pipes and indoor drain hose extension are
thermally insulated.
Draining line is properly installed.
System is properly grounded.
Only specified wires are used for all wiring, and all wires are connected
correctly.
Indoor or outdoor unit's air inlet or air outlet are unobstructed.
Stop valves are opened.
[For FFQ models]
Check that the connector of the lead wires of the decoration panel is
connected securely.
Indoor unit properly receives remote control commands.
English
.
Test items
Symptom
Fall, vibration, noise
Incomplete cooling/heating function
Water leakage
Water leakage
Electrical leakage
No operation or burn damage
Incomplete cooling/heating function
Incomplete cooling/heating function
Louvers do not move
No operation
Check
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx12rmvju9aRxl09qmvjuaRxl12qmvju9a

Table of Contents