AEG L6FBK141B User Manual page 22

Table of Contents

Advertisement

option, the indicator of the set option
comes on.
In case a selection is not possible,
no indicator comes on and an
acoustic signal sounds.
12.6 Starting a programme
Touch the Start/Pause button to start the
programme.
The related indicator stops flashing and stays
on.
The programme starts, the door is locked.
The display shows the indicator
The drain pump can operate shortly
before the appliance fills water.
12.7 Starting a programme with the
delay start
Touch the Start/Pause button.
The appliance starts the countdown of the
delay start.
When the countdown is completed, the
programme starts.
The PROSENSE adapts starts at the end
of the countdown.
Cancelling the delay start after the
countdown has started
To cancel the delay start:
1. Touch the Start/Pause button to pause
the appliance. The related indicator
flashes.
2. Touch the Delay Start button repeatedly
until the display shows
3. Touch the Start/Pause button again to
start the programme immediately.
Changing the delay start after the
countdown has started
To change the delay start:
22
ENGLISH
.
.
1. Touch the Start/Pause button to pause
the appliance. The related indicator
flashes.
2. Touch the Delay Start button repeatedly
until the display shows the desired delay
time.
3. Touch the Start/Pause button again to
start the new countdown.
12.8 The ProSense load detection
The programme duration in the display is
referred to a medium/high load.
1. The appliance detects the load in the first
30 seconds: the indicator
dots flash, the drum rotates shortly.
2. At the end of the load detection, the
indicator
goes off and the time dots
stop flashing. The programme duration
will be adjusted accordingly and could
increase or decrease. After further 30
seconds, the water filling starts.
In this case, for 30 seconds, it is possible to
pause the appliance and remove the
exceeding garments.
Once removed the exceeding garments,
touch the Start/Pause button to start the
programme again. The ProSense phase can
be repeated up to three times (see point 1).
Important! If the laundry amount will not be
reduced, the washing programme starts
anyway, despite the overload. In this case, it
will be not possible to guarantee the best
washing results.
About 20 minutes after the programme
start, the programme duration could be
adjusted again depending on the
capacity of water absorption of the
fabrics.
The ProSense detection is carried out
with complete washing programmes only
(no skipping phase selected).
and the time

Advertisement

Table of Contents
loading

Table of Contents