Installation Procedures

These steps summarize your switch installation. The rest of this chapter
provides details on these steps.
1.
Prepare the installation site
environment into which you will be installing the switch is properly
prepared, including having the correct network cabling ready to connect
to the switch and having an appropriate location for the switch. See
2-3
for some installation precautions.
2.
Verify the switch passes self test
power source and observe that the LEDs on the switch's front panel
indicate correct switch operation.
3.
Mount the switch
or on a horizontal surface.
4.
Connect power to the switch
plug it into the main power source.
5.
Connect the network devices
network cables, connect the network devices to the switch ports.
At this point, your switch is fully installed. See the rest of this chapter if you
need more detailed information on any of these installation steps.
(page
2-5). Make sure the physical
(page
(page
2-8). The switches can be mounted on a wall
(page
2-11). Once the switch is mounted,
(page
2-12). Using the appropriate
Installing the Switch
Installation Procedures
2-6). Plug the switch into a
page
2-4