Hyundai VG Series Manual

Hyundai solar module

Advertisement

Quick Links

HYUNDAI SOLAR MODULE
VG
PERC Shingled
HiE-S390VG HiE-S395VG HiE-S400VG
HiE-S405VG HiE-S410VG HiE-S415VG
SERIES
HiE-S420VG
Shingled
Technology
M6 PERC Shingled
M6 PERC Shingled Technology provides
ultra-high efficiency with better
performance in low irradiation. Maximizes
installation capacity in limited space.
Reliable Warranty
Global brand with powerful financial
strength provide reliable 25-year warranty.
(Australia and Europe Only)
Hyundai's Warranty Provisions
25-Year Product Warranty
25
• On materials and workmanship
Australia and Europe Only
25-Year Performance Warranty
25
• Initial year: 98.0%
• Linear warranty after second year:
with 0.55%p annual degradation,
84.8% is guaranteed up to 25 years.
Certification
www.hyundai-es.co.kr
For Both
More Power
Residential &
Generation
Commercial
In Low Light
Applications
About Hyundai Energy Solutions Co., Ltd
Established in 1972, Hyundai Heavy Industries Group is one of the most trusted names in the
heavy industries sector and is a Fortune 500 company. As a global leader and innovator, Hyundai
Heavy Industries is committed to building a future growth engine by developing and investing
heavily in the field of renewable energy.
As a core energy business entity of HHI, Hyundai Energy Solutions has strong pride in providing
high-quality PV products to more than 3,000 customers worldwide.
Mechanical Strength
Tempered glass and reinforced frame
design withstand rigorous weather
conditions such as heavy snow and strong
wind.
UL / VDE Test Labs
Hyundai's R&D center is an accredited test
laboratory of both UL and VDE.
Printed Date: 08/2021

Advertisement

Table of Contents
loading

Summary of Contents for Hyundai VG Series

  • Page 1 About Hyundai Energy Solutions Co., Ltd Hyundai’s Warranty Provisions Established in 1972, Hyundai Heavy Industries Group is one of the most trusted names in the 25-Year Product Warranty heavy industries sector and is a Fortune 500 company. As a global leader and innovator, Hyundai •...
  • Page 2 Front Glass: White toughened safety glass, 3.2mm Construction Encapsulation: EVA (Ethylene-Vinyl-Acetate) Maximum DC 1,500 System Voltage Frame Anodized aluminum Fire Rating Class C Series Fuse Rating Maximum Front 5,400 Pa Surface Load Capacity Rear 2,400 Pa Manufactured in China Printed date: 08/2021 Sales & Marketing sales@hyundai-es.co.kr...
  • Page 3 “CUSTOMER”). The Warranties defined herein apply only to the MODULES which (a) are sold directly by HYUNDAI or through one of its authorized local distributors and (b) have a legible Hyundai Energy Solutions Co., Ltd. logo and product serial number.
  • Page 4 If the MODULES fail to conform to this warranty during this Product Warranty Period, (a) HYUNDAI has the right to choose the net value of the defective MODULES or the current market MODULE price refunded to the CUSTOMER, the so-called defective MODULES of the net value of the MODULES purchased at the time on the basis of the first deduction of 16% depreciation, subsequent annual deductions 3.5% depreciation,...
  • Page 5 A. A warranty claim under any of the foregoing Warranties must be filed within the applicable warranty period. B. The Warranties do not apply to any MODULE, which in HYUNDAI’s sole and absolute judgment, has been subjected to: (a) Damage and/or failure caused by use on a mobile unit including, but not limited to, vehicles, vessels, etc.;...
  • Page 6 E. HYUNDAI will decide, at its sole and absolute option, whether to collect replaced MODULES or not. In the case HYUNDAI decides to collect all or some of the replaced MODULES, HYUNDAI will cover transportation (other than air transport) costs for returning the MODULES.
  • Page 7 Module(s) in writing of the alleged claim, or that; (ii) this written notification has been sent directly to HYUNDAI in the event that the authorized reseller/distributor no longer exists (e.g. due to discontinuance of business or bankruptcy).
  • Page 8 **“STC(Standard Test Conditions)”is as follows: (a) light spectrum of AM 1.5, (b) an irradiation of 1,000 and (c) a cell temperature of 25 ℃. The measurements must be carried out at HYUNDAI or an independent test institute agreed to by HYUNDAI in advance, in accordance with IEC60904 as tested at the junction box connectors per the calibration and testing standards of HYUNDAI.
  • Page 9 HES INSTALLATION MANUAL (IEC) Issued on June. 13 , 2022 (Version1.1)
  • Page 10: Table Of Contents

    Contents 1 General Information ------------------------------------------------------------------------------------------------------------------------------------------------ 1 Installation Manual Disclaimer ----------------------------------------------------------------------------------------------------------------------------- 1 Limitation of liability ------------------------------------------------------------------------------------------------------------------------------------------ 1 2 General Principles Of Security ------------------------------------------------------------------------------------------------------------------------------------ 1 Electrical safety ------------------------------------------------------------------------------------------------------------------------------------------------ 2 Fire Safety ------------------------------------------------------------------------------------------------------------------------------------------------------- 3 Transportation safety ----------------------------------------------------------------------------------------------------------------------------------------- 3 Install Security -------------------------------------------------------------------------------------------------------------------------------------------------- 3 3 Electrical Properties ------------------------------------------------------------------------------------------------------------------------------------------------- 4 Electrical installation ------------------------------------------------------------------------------------------------------------------------------------------ 4 Cables and wires ----------------------------------------------------------------------------------------------------------------------------------------------- 5 Connector ------------------------------------------------------------------------------------------------------------------------------------------------------- 5...
  • Page 11: General Information

    Solution to obtain relevant products and documents. Limitation of liability Hyundai Energy Solution shall not be responsible for any kind of injury, including but not limited to physical injury or property damage caused by module operation, system installation error or failure to follow instructions in this manual.
  • Page 12: Electrical Safety

    Avoid contact with modules directly, which may cause electric shocks or cuts. The installation should comply with the laws and regulations specified by the relevant region and country. If necessary, obtain the required certificates such as building permit. Module installation shall be carried out by qualified professionals with technical knowledge and familiarity with the mechanical and electrical requirements of the system.
  • Page 13: Fire Safety

    Do not coat the surface of the module with  Do not install modules without taking protective  corrosive chemicals. measures. Do not install or operate modules in damp or  Do not use any means other than connectors for ...
  • Page 14: Electrical Properties

    The glass can protect the module, improper operation may cause the glass to be broken. Damaged module pose a risk of electric shock and fire. Such modules cannot be repaired or repaired and should be replaced immediately. When sunlight strikes the front of the module, the module generates electricity and the DC voltage may exceed 30V.
  • Page 15: Cables And Wires

    Bypass Diode The junction box of the Hyundai Energy Solution module contains the bypass diode and forms a parallel structure with the circuit. When the solar cells of the module is blocked or damaged, the hot spot phenomenon occurs in the part of the module, the diode will work, so that the current no longer flows through the hot spot solar cell, so as to limit the heating and performance loss of the module.
  • Page 16: Grounding

    Grounding The module use anodized corrosion-resistant aluminum alloy frames as rigid supports. To protect the module from lightning and static electricity, and to protect personal safety. All frames and mounting brackets of the components must be grounded. If there are no specific regulations, please follow the International Electrotechnical Commission standard or other international standards.
  • Page 17: Handling, Transportation, Storage And Unpacking

    4 Handling, transportation, storage and unpacking Hyundai Energy Solution’s module have horizontal packaging and vertical packaging according to different product. There are significant differences between horizontal packaging and vertical packaging in loading, unloading, transportation and unpacking.
  • Page 18: Storage

    Retail packaging If the modules are not filled when they are shipped, Hyundai Energy Solution uses wooden frames of the same size as the modules as packing fillers. The wooden frames are located in the middle of the packaging body, and the scattered packaging method is exactly the same as the integral packaging method.
  • Page 19: Unpacking

    HiE-SxxxUF Series, HiE-SxxxUH Series, HiE-SxxxVG Series, HiE-SxxxVI Series, HiE-SxxxHG Series, HiE-SxxxDG Series HiE-SxxxKN Series horizontal packing and unpacking is the conventional packing method, which will not be specified here. If you have any questions in the process of unpacking, please contact Hyundai Energy Solution commercial department to provide specific information.
  • Page 20 Two people stand on the frame surface of Gently push the assembly so that it leans the module to hold the component, while Remove all modules in sequence to against the support frame and remove the the other person cuts the lower two complete module unpacking vertical steel strip transverse plastic steel packing belts...
  • Page 21: Module Installation

    Stainless steel or aluminum materials must be used to contact the photovoltaic module, and the installation part must be treated with anti-corrosion. Please consult the Hyundai Energy Solution technical support department for more information on the use of modules in special ...
  • Page 22: Machinery Installation

    Machinery Installation Ensure that the module installation strong enough, supporting system composed of the phalanx system components must be able to withstand the mechanical load pressure, appointed by it' s bracket installer must provide the guarantee, mounting bracket needed and static mechanics analysis ability of the third party testing institutions to test, need to adopt international standards or national standards.
  • Page 23: Wiring

    Wiring Hyundai Energy Solution provides recommended connection modes for customers. If the connection modes required by the installation personnel are different from the recommended connection modes, please contact Hyundai Energy Solution commercial personnel to evaluate the feasibility of connection modes.
  • Page 24 Horizontal installation (double row, junction box on the outside) 72/78 version of the total wire length is not less than 2400mm, 60/66 version of the total wire length is not less than 2000mm. HiE-SxxxUF Series HiE-SxxxUH Series HiE-SxxxVG Series HiE-SxxxVI Series Horizontal installation (single row) 72/78 version of the total wire length is not less than 2400mm, 60/66 version of the total...
  • Page 25 Vertical mounting (head to tail connection) this connection mode HiE-SxxxDI Series / HiE-SxxxKI Series / HiE-SxxxDJ Series / HiE-SxxxKJ Series the total wire length must least 1500mm. HiE-SxxxKN Series / HiE-SxxxHG Series the total wire length must be at least 1300mm,Pay attention to the positive and negative terminals and ensure that the modules are turned at intervals.
  • Page 26: Installation Guide

    Modules must be installed according to the installation instructions to comply with IEC requirements. Connections between modules and support systems can be installed using mounting holes in the frame, clamps If the installation method used is different from the recommended installation method, please get approval from Hyundai Energy Solution.
  • Page 27 Eight mounting hole installation(mounting hole size:9*14mm) Installation rail vertical to the long side of the module, applicable type: HiE-SxxxUH HiE-SxxxVI HiE-SxxxVI(FB) Mechanical load:Front side ≤5400Pa,Rear side ≤2400Pa Remark:The width of bolting installation surface of frame which called “C”side is 30mm. Inner four mounting hole installation(mounting hole size:9*14mm)...
  • Page 28: Installation Method: Clamps

    Installation method: Clamps Use a certain number of clamps to secure the modules to the mounting rail. Hyundai Energy Solution recommends that fixtures be clamped to the frame of module. The clamps shall be made of anodized aluminum alloy or stainless steel.
  • Page 29 Four clamps mounting on long side of frame and rails perpendicularly to the long side frame Module types A Range(mm) Max. Mechanical load(Pa) 280-380 HiE-SxxxUG Front side≤5400,Rear side≤2400 280-380 HiE-SxxxUF, HiE-SxxxUF(FB) Front side≤5400,Rear side≤2400 295-395 Front side≤5400,Rear side≤2400 HiE-SxxxVG, HiE-SxxxVG(FB) 330-430 HiE-SxxxHG, HiE-SxxxHG(FB) Front side≤5400,Rear side≤2400...
  • Page 30 Four clamps mounting on short side of frame and rails perpendicularly to the short side frame Module types A Range(mm) Max. Mechanical load(Pa) 650-750 HiE-SxxxDI Front side≤5400,Rear side≤1400 650-750 Front side≤5400,Rear side≤1400 HiE-SxxxDJ Six Clamps mounting on long side of frame and rails perpendicularly to the long side frame,the middle rail is located in the center of the module Module type A Range(mm)
  • Page 31 Eight clamps mounting on long side of frame and rails perpendicularly to the long side frame Module types A Range(mm) A+B Range(mm) Max. Mechanical load(Pa) HiE-SxxxKL 355-455 495-595 Front side≤5400,Rear side≤2400 Front side≤5400,Rear side≤2400 HiE-SxxxKG 520-620 375-475 Front side≤5400,Rear side≤2400 HiE-SxxxKN 525-625 380-480...
  • Page 32: Maintenance

    7 Maintenance Modules need to be inspected and maintained regularly, especially during the warranty period. To ensure optimum performance of the modules, the following maintenance measures are recommended. Cleaning When modules are working, there should not be environmental influence factors to cover shadows in the modules, such as other modules, supporting rail, plants, large number of dust etc., which may directly reduce the power output and may even cause regional hot–spot effect.
  • Page 33: Amended Editions And Dates

    Check the connector interface sealing and whether there is loose, melt deformation, aging or corrode.  Check that the cable connections are secure and that the modules are properly grounded.  When module is found to be defective, consult a qualified service technician. If servicing is required, it should be serviced ...

Table of Contents