Advertisement

Quick Links

SAVANNAH II
(DB03028 model)
CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS
IN LOCAL AREA.
READ THIS ENTIRE MANUAL BEFORE INSTALLATION AND USE OF THIS WOOD STOVE. FAILURE TO FOLLOW THESE
INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE, BODILY INJURY OR EVEN DEATH.
READ AND KEEP THIS MANUAL FOR REFERENCE
Printed in Canada
Wood Stove
Owner's Manual
Part 2 of 2
INSTALLATION AND OPERATION
US Environmental Protection Agency
phase II certified wood stove compliant
with 2020 cord wood standard
Safety tested according to CAN/ULC
S627, UL 1482 and UL 737 standards
by an accredited laboratory.
REQUIREMENTS
MOBILE
HOME
46172_IA
2023-07-28

Advertisement

Table of Contents
loading

Summary of Contents for Drolet SAVANNAH II

  • Page 1 Wood Stove Owner's Manual Part 2 of 2 INSTALLATION AND OPERATION SAVANNAH II REQUIREMENTS (DB03028 model) US Environmental Protection Agency phase II certified wood stove compliant with 2020 cord wood standard Safety tested according to CAN/ULC S627, UL 1482 and UL 737 standards by an accredited laboratory.
  • Page 2 If it can not be provided, the warranty period will be determined by the date of manufacture of the product. It is also highly recommended to register the warranty online at https://www.drolet.ca/en/warranty/warranty-registration/ Registering the warranty will help to quickly find the information needed on the unit.
  • Page 3: Table Of Contents

    6.7 Mobile Home Installation ....................31 7. Maintenance/Parts Replacement ..................32 7.1 Replacement ........................32 7.2 Gasket ..........................33 7.3 Door ..........................33 8. Exploded Diagram and Parts List ..................36 DROLET LIMITED LIFETIME WARRANTY ................. 39 Installation and Operation Requirements - Savannah II Page 3...
  • Page 4: Certification Plate

    1. CERTIFICATION PLATE Page 4 Installation and Operation Requirements - Savannah II...
  • Page 5: General Information

    This appliance is officially tested and certified by an independent agency. Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053-17. Based on EPA letter dated November 1, 2022. Carbon monoxide. Installation and Operation Requirements - Savannah II Page 5...
  • Page 6: Specifications

    CAN/CSA- Z240 MH standard. Tested and certified in compliance with CFR 40 part 60, subpart AAA, section 60.534(a)(1(ii) and ASTM E3053-17. Based on EPA letter dated November 1, 2022 Page 6 Installation and Operation Requirements - Savannah II...
  • Page 7: Dimensions

    Dimensions 2.3.1 Stove Dimensions Figure 1: Top View Figure 2: Front View Figure 3: Side View Installation and Operation Requirements - Savannah II Page 7...
  • Page 8 2.3.2 Combustion Chamber Dimensions Figure 4: Door Opening Figure 5: Front View - Combustion Chamber Figure 6: Side View - Combustion Chamber Page 8 Installation and Operation Requirements - Savannah II...
  • Page 9 The front (3rd) piece should stand off on the steel andirons by approximately 1-2 inches. The 2 other pieces should be added on top of the first Installation and Operation Requirements - Savannah II Page 9...
  • Page 10 4 inches cross section dimensions approximately) on top. To make sure combustion is equal, put the smallest piece on top of the first three, at the back of the firebox (see Figure 15 for an example of low burn load). Page 10 Installation and Operation Requirements - Savannah II...
  • Page 11 For optimal medium fire load, use medium to large size fuel pieces (between 4- and 5.5-inches cross section dimensions approximately) on the bottom and use small to medium size fuel pieces (2.5 to 4 inches cross section dimensions approximately) on top. To make sure combustion is Installation and Operation Requirements - Savannah II Page 11...
  • Page 12 4 and 15 minutes after the loading period. Before closing further, make sure the flame intensity is increasing or stable. Turn ON the blower at maximum speed. Page 12 Installation and Operation Requirements - Savannah II...
  • Page 13: Clearances To Combustible Material

    20 ¾" (527 mm) 20 ¾" (527 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - Savannah II Page 13...
  • Page 14 48" Flush 48" 36" 122 cm 92 cm Figure 19: Clearances - Top Figure 20: Clearances - Corner 84" 213 cm Figure 21: Clearances - Side Page 14 Installation and Operation Requirements - Savannah II...
  • Page 15 6" from combustible materials must be used. Only in this case, the same clearances as a certified double wall pipe connector can be used. The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - Savannah II Page 15...
  • Page 16 21 ¾" (552 mm) 21 ¾" (552 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 16 Installation and Operation Requirements - Savannah II...
  • Page 17 The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Installation and Operation Requirements - Savannah II Page 17...
  • Page 18 20 ¾" (527 mm) 20 ¾" (527 mm) The pipe distances listed in this table refer to the distances obtained when the stove is installed in accordance with the appliance clearances above mentioned. Page 18 Installation and Operation Requirements - Savannah II...
  • Page 19 122 cm 92 cm Les distances de tuyau listées dans ce tableau se réfèrent aux distances obtenues lorsque le poêle est installé en accord avec les dégagements de l’appareil mentionnés ci-dessus. Installation and Operation Requirements - Savannah II Page 19...
  • Page 20: Floor Protection

    The floor protection at the back of the stove is limited to the stove’s required clearance if such clearance is smaller than 8 inches (203 mm). Only required under the horizontal section (Ho) of the connector. Must exceed each side of the connector by at least 2 inches (51 mm). Page 20 Installation and Operation Requirements - Savannah II...
  • Page 21: Reducing Wall And Ceiling Clearances Safely

    Mounting hardware must not be located closer than 8" (200 mm) from the vertical centre line of the appliance. G) Edge clearance for ceiling shields to side and back walls: 3" (75 mm) Shield extension beyond each side of the appliance: 18" (450 mm) Installation and Operation Requirements - Savannah II Page 21...
  • Page 22 Figure 23: Heat shield clearances Figure 24: Heat shield clearances Figure 25: Heat shield clearances Figure 26: Heat shield clearances Page 22 Installation and Operation Requirements - Savannah II...
  • Page 23 Brick, with a minimum of 24 gauge (0.61 mm) sheet metal backing, spaced out at least 1" (25 mm)* by non-combustible spacers 12" (305 mm) * In Canada this space can be ⅞" (21 mm) Installation and Operation Requirements - Savannah II Page 23...
  • Page 24: Installation Of Options On Your Product

    (HVAC type, must meet ULC S110 or UL 181 class 0 or class 1) (B), sold separately. Refer to air intake kit installation instructions for more details. Page 24 Installation and Operation Requirements - Savannah II...
  • Page 25: Optional Fire Screen Installation

    Lift the fire screen upwards and push the bottom part towards the stove then let the fire screen rest on the bottom of the door opening. Warning: Never leave the stove unattended while in use with the fire screen. Installation and Operation Requirements - Savannah II Page 25...
  • Page 26: Optional Blower Installation

    Ensure that the blower’s power cord is not in contact with any surface of the stove to prevent electrical shock or fire damage. Do not run the power cord beneath the stove Page 26 Installation and Operation Requirements - Savannah II...
  • Page 27: Optional Thermodisc Installation

    Screw the thermodisc (A) with the screws (B) provided on the back of the stove. The electrical cord of the thermodisc should not touch any surface of the stove to avoid electric shock or fire. Do not run the power cord under the stove. Installation and Operation Requirements - Savannah II Page 27...
  • Page 28: Log Retainers Installation

    Log Retainers Installation Page 28 Installation and Operation Requirements - Savannah II...
  • Page 29: Air Tubes And Baffle Installation

    Put the baffle in place. Repeat steps 1 and 2 for the three other tubes. To remove the tubes use the above steps in reverse order. Installation and Operation Requirements - Savannah II Page 29...
  • Page 30 Note that secondary air tubes (B) can be replaced without removing the baffle board (A) and that all tubes are not necessarely identical (look at the part number on the tube). Page 30 Installation and Operation Requirements - Savannah II...
  • Page 31: Mobile Home Installation

    Mobile Home Installation Screw the base on the floor with the proper hardware. Installation and Operation Requirements - Savannah II Page 31...
  • Page 32: Maintenance/Parts Replacement

    Reinstall the glass, being careful to centre the glass in the door and not to over-tightening the retaining screw. The two main causes of broken door glass are uneven placement in the door and over-tightening the retaining screws. Page 32 Installation and Operation Requirements - Savannah II...
  • Page 33: Gasket

    Remove the split pin by pulling and turning it using pliers. Turn the handle one counterclockwise turn to increase pressure. Reinstall the split pin with a small hammer. Figure 27: Removing the split pin Figure 28: Installing the split pin Installation and Operation Requirements - Savannah II Page 33...
  • Page 34 Using a flat screwdriver, turn the adjustable hinge rods in the direction shown to adjust the doors. Tighten all door hinge pressure screws when they are at the desired positions. Configurations 1-2-3-4-5-6, show in which direction these act on the adjustment of the door. Page 34 Installation and Operation Requirements - Savannah II...
  • Page 35 Leave about ½" long of the gasket when cutting and press the end into the groove. Tuck any loose fibers under the gasket and into the silicone. Close the door. Do not use the stove for 24 hours. Installation and Operation Requirements - Savannah II Page 35...
  • Page 36: Exploded Diagram And Parts List

    8. Exploded Diagram and Parts List Page 36 Installation and Operation Requirements - Savannah II...
  • Page 37 4'' X 9'' X 1 1/4'' REFRACTORY BRICK 29010 4 1/2" X 9" X 1 1/4" REFRACTORY BRICK PL36274 3 5/8" X 5 3/4" X 1 1/4" REFRACTORY BRICK PL70516 SECONDARY AIR TUBE Installation and Operation Requirements - Savannah II Page 37...
  • Page 38 RHEOSTAT KNOB 44087 RHEOSTAT NUT 44080 RHEOSTAT WITHOUT NUT (MODEL KBMS-13BV) AC05959 METALLIC BLACK STOVE PAINT - 342 g (12oz) AEROSOL SE46172 INSTRUCTION MANUAL SAVANNAH II PL75747 1.7 SERIES SECONDARY AIR TUBE Page 38 Installation and Operation Requirements - Savannah II...
  • Page 39: Drolet Limited Lifetime Warranty

    Shall your unit or a component be defective, contact immediately your DROLET dealer. To accelerate processing of your warranty claim, make sure to have on hand the following information when calling: •...
  • Page 40 Resale is strictly prohibited. The manufacturer may update St-Augustin-de-Desmaures (Québec) Canada this document from time to time and cannot be responsible G3A 2H3 for problems, injuries, or damages arising out of the use 1-877-356-6663 of information contained in any document obtained from https://www.drolet.ca/us/en/ unauthorized sources. tech@sbi-international.com...

This manual is also suitable for:

Db03028

Table of Contents