Chapter 5. Quick-Deploy Rack Kit Installation Instructions; Overview; Kit Contents - Samsung ES1642dc Hardware User Manual

Qnap enterprise-class
Table of Contents

Advertisement

Chapter 5. Quick-Deploy Rack kit Installation Instructions

Overview

This chapter details instructions for installing QNAP rack rails into square-hole racks for the 3U ES NAS.
These quick rails automatically latch into the square holes of racks and greatly reduce installation time.

Kit contents

Item
Two mounting rails (left
and right)
NOTE: This rail will fit a rack
between 24" and 36" deep.
Two cage nuts
Six Phillips Screw
Caution
Electrostatic discharge (ESD) can damage electronic components. Perform proper grounding practices
before beginning any installation procedure.
Caution
Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the
heaviest item first, and continue to populate the rack from the bottom to the top.
Warning
Ensure that the rack is level and stable before working on the rack. Ensure that the rack is level
and stable before working on the rack. Be sure the leveling jacks (feet) extend to the floor and that the
full weight of the rack rests firmly on the floor.
Figure
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nas seriesEs1640dc

Table of Contents