OPERATION
1 To start the gneerator, perform the following steps:
1.1 Turn the ECO THROTTLE switch to "ON"
1.2 Turn the multi-switch to the "CHOKE" position.
1.3 Place one hand on the generator to hold it in place,
and pull on the recoil starter handle slowly until a slight
resistance is felt. Then pull quichly to start the engine.
Return cord gently into the machine. Never allow the
cord to snap back.
1.4 When engine starts, turn the multi-switch to the "ON"
position.
20