Commissioning - Baxi Lite Compact LC550 Installation And Service Manual

Table of Contents

Advertisement

Available languages

Available languages

4 COMMISSIONING

4.1
Initial commissioning
Initial commissioning must be performed by a qualified professional.
4.2
Checklist after commissioning
A few days after the appliance is commissioned, please:
Check the installation
Check the tightness of the connections
Check the water pressure
Check that there are no errors on the control panel
Inform the user of the frequency of maintenance work to be carried out
Explain how the system and control panel work to the users
Hand over all manuals to the user
4.3
Operating the Unit
Mode #
800W power heating (single tank)
1
1600W power heating (both tanks)
2
Energy saving Active (Temp. = 55°C)
3
Smart control energy Active
4
Anti-legionella mode Active (Temp. = 80°C during 5 min)
5
Reservation
6
Mode description
Mode Active
8
1
7
6
H
2
3
Indicator
Indicator 4 ON
Indicator 5 ON
Indicator 8 ON
Indicator 9 ON
-
Indicator 6 ON
5
4
Fig.7
38

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Lite compact lc580Lite compact lc510

Table of Contents