CONNECTIONS – PLUMBING
All plumbing work must be carried out by a qualified person and in compliance
with the Standard AS/NZS 3500.4 and all local codes and regulatory authority
requirements.
All gas work must be carried out by a qualified person and in compliance with
the Standard AS/NZS 5601.1, all local codes and regulatory authority
requirements.
CONNECTION SIZES
Hot water connection:
Cold water connection:
Relief valve connection:
Gas inlet:
WATER INLET AND OUTLET
All pipe work must be cleared of foreign matter before connection and purged
before attempting to operate the water heater. All olive compression fittings must
use brass or copper olives. Use an approved thread sealant such as Teflon tape
on all sealing threads.
An isolation valve and non-return
valve must be installed on the cold
water line to the water heater. An
acceptable arrangement is shown in
the diagram.
"Hot Water Delivery"
Refer also to
page 29 and to
Supply"
on page 27.
A disconnection union must always be provided at the cold water inlet and hot
water outlet on the water heater to allow for disconnection of the water heater.
This water heater has either a plastic dip tube or
fitting liner in the inlet and outlet fittings (see
diagram). These must be in place for the water
heater to function properly. Do not remove or
damage them by using heat nearby. They will be
pushed into the correct position as the fitting is
screwed in.
on
"Mains Water
34
Rp 3/4
Rp 3/4
Rp 1/2
Rp 1/2

