Securing the burner to the boiler

Prepare a suitable lifting system using rings
3)(Fig. 14).
 Fit the heat insulation supplied onto the blast tube.
 Fit the entire burner onto the boiler hole prepared previously
(Fig. 13 on page 20), and fasten with the screws supplied.
The seal between burner and boiler must be
airtight.
WARNING
5.8

Access to head internal part

 Remove the gas servomotor.
 Disconnect the socket 2) of the gas pressure switch.
 Remove the 4 fixing screws 3).
 Open the burner on the hinge as in Fig. 15.
 Unhook the probe cables and electrode 4).
 Turn the underneath part of the elbow 5) anticlockwise up to
release it from its housing.
 Undo the screw 6) with pressure test point.
 Remove the internal part of the head 7).
5.9

Probe-electrode position

Check that the probe and the electrode are placed
as in Fig. 16, according to the dimensions indicat-
ed.
WARNING
1 8 . 5
5.10

Combustion head adjustment

The servomotor of the air damper changes the air flow rate de-
pending on the output requested, while the servomotor of the
combustion head changes the shutter opening.
Installation
Electrode
Probe
This system allows an optimal setting even at a minimum firing
rate.
21
GB
3
3
1
6
3
7
4
5
2
20162129
20181298
1
2
5
1
Fig. 14
20162276
Fig. 15
8
Fig. 16
20167105

Advertisement

Table of Contents
loading

This manual is also suitable for:

20160293

Table of Contents