5.11.2 Installing the ridge tiles for the 60/100 mm
diameter roof duct
5.11.2.1 Scope of delivery, article number 303982
(black)
1
Ridge tile terminal,
black
5.11.2.2 Ridge roof duct
According to the specifications from the tile manufacturer, a
suitable ridge tile must be installed.
130
103
≥25
133
Suitable ridge tiles are manufactured by:
Repco Roof Tiles Limited
49 Maurice Gaymer Road
Attleborough
Norfolk, NR17 2QZ
enquiries@repcorooftiles.co.uk
Tel: +44 (0) 808 1333001
34
1
2
2
48 mm air pipe clamp
130
103
≥20
≤125°
5.11.2.3 Installing the ridge tile terminal
1.
Install the ridge tile in accordance with the specifica-
tions from the tile manufacturer.
2.
Insert the ridge tile terminal into the ridge tile.
3.
Align the ridge tile terminal in such a way that the two
fixing tabs (1) are at a right angle to the course of the
ridging. This ensures that the combustion air can be
extracted from between the ridge tile and the air hood
above the ridge tile.
1
2
4.
Bend the two fixing tabs (2) on one bar (1).
5.
Use nails or screws to secure the fixing tabs.
6.
Install the boiler (→ Installation instructions for the boil-
er).
7.
Install the extensions. (→ Page 46)
8.
Install the elbows (→ Page 49).
9.
Connect all of the pipe joints with air pipe clamps.
(→ Page 54)
10.
Connect the ridge tile terminal and the boiler to exten-
sions and elbows.
Air/flue pipe installation manual 0020308120_02