Chapter 2
Attach the New Control Panel Bezel
Attach the new control panel bezel, as shown in Figure 2-19. Push in the snap
latches on the left and right ends of the control panel bezel, and gently push those
latches into the two slots on the front of the HP NetServer indicated in the figure.
28
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Snap Latch
(2 Places)
Figure 2-19. Installing the New Control Panel Bezel
Preparing the HP NetServer
Control Panel Bezel