Download Print this page

Cooper Lighting NEO-RAY Series 75 Installation Manual page 2

Cooper lighting mount wall angle installation manual

Advertisement

Figure 3
LIGHTING STRIPS INSTALLATION (SEE DETAILS A & B)
STEP 1. Remove lighting strips covers
STEP 2. Install lighting strips into fixtures (attach to clevis bracket)
STEP 3. Attach first strip to outside power feed
STEP 4. Through wire all strips
STEP 5. Attach lighting strip covers to lighting strips
STEP 6. Install shielding
STEP 7. Install End Closure/End Plate
END CLOSURE (FLAT)
END PLATE (FLANGED)
Typical Plan View
(Schematic)
TIE-WIRE
NOT BY NEO-RAY
6"
CEILING TILE
BY OTHERS
3/8"
Series 75R Installation Manual, Page 2 of 2
100 Andrews Rd., Hicksville, NY 11801 • Phone: 516-470-1000 • Fax: 516-470-1077 • http://www.neoray-lighting.com
SERIES 75 INSTALLATION MANUAL
END CLOSURE
STEEL HOUSING
3 15/16"
WALL RAIL
FINISH: BLACK
1/4"
3 3/16"
5/8"±1/8"
4 7/8"±1/8"
FLEXIBLE CONDUIT
(NOT BY NEO-RAY)
ADJUSTABLE STRIP
STAGGERED STRIP
a) 3" STAGGER FOR T8 LAMP
b) 6" STAGGER FOR T5 OR T5HO LAMP
ALUMINUM HOUSING
ADJUSTABLE
LIGHT STRIP
90° OUTSIDE CORNER
(O.C.)
135° OUTSIDE CORNER
(O.C.)
DETAIL A
CHASE NIPPLE
TOP VIEW
DETAIL B
WORK FROM LEFT TO
RIGHT WHEN FACING WALL.
LAST HOUSING OF RUN IS FABRICATED OF ALUMINUM
TO BE FIELD CUT BY INSTALLING CONTRACTOR.
END PLATE
CLEVIS BRACKET
LIGHT STRIP
LIGHT STRIP COVER
90° INSIDE CORNER
(I.C.)
135° INSIDE CORNER
(I.C.)

Advertisement

loading