Stanley ST-125-OFR-E Manual page 6

Hide thumbs Also See for ST-125-OFR-E:
Table of Contents

Advertisement

NEVER LEAVE HEATER UNATTENDED WHILE BURNING OR
- Remove the heater and all packaging materials
from the shipping carton.
Carry Handle (1)
Carry Handle Assembly
1. Align holes in the upper housing with the 2
holes in the handle as shown in Figure 2.
2. Insert screws and tighten firmly.
Figure 2
© 2021 Pinnacle Climate Technologies, Inc.
WHILE CONNECTED TO A POWER SOURCE
Assembly Instructions
ST-70-SS-E / ST-70T-SS-E
What's In The Box
Note: Save the box and packaging materials
for future storage.
Black Screws (2)
Tools Needed:
- Phillips Head Screw Driver
Attach the handle while still in the box
for easier unpacking. (See Figure 3)
Figure 3
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-70t-ss-eSt-70-ss-e

Table of Contents