Quick BTR Series Installation And User Manual page 13

Retractable thrusters
Table of Contents

Advertisement

4 - Installation
Fig. 12
HULL
D
Fig. 13
• Drill the angle bracket and also secure the other two M8 screws (fig. 13) firmly.
4.3 - Retractable thruster installation
Fig. 14
ACTUATOR
Ref. 13B
Ref. 14A
O-RING
• Remove the previously applied adhesive protectors from the counter flange.
• Verify that the O-ring seat is well cleaned and has not been damaged during installation.
• Position the O-ring correctly on the counter flange (ref. 14A), assemble the retractable
thruster (fig.14), spread marine grease on the bolt threads (ref. 14B) and fix securely with
the supplied screws.
The counter flange screws should be tightened to 15Nm, tightening little by little
in a cross pattern as in the example in figure 15.
WARNING: after about a week from installation, check the correct tightening of
the screws to compensate for any settling of the O-ring.
COUNTER FLANGE
HATCH
ACTUATOR
LEVER
PROPELLER
QUICK BTR Series INSTALLATION AND USER'S MANUAL - REV 001C
A
HINGE
WARNING: for a sturdy fixing of the hinge and bracket, the
hatch must not have hollow areas, or non-structural infilling (fig.
12).
Ø140
Ø185
A
Min 5mm
Min 5mm
B
37-57mm
60-65mm
C
30mm
35mm
D
5 mm
15mm
MOTOR
NUT
WASHER
O-RING
COUNTER FLANGE
WASHER
BOLT
HULL
BTR Series
ANGLE BRACKET
B
Hull: C
Ø250
Ø300
Min 5mm
Min 5mm
65-80mm
110-120mm
40mm
40mm
20mm
20mm
Fig. 15
7
11
5
2
10
4
8
12
6
EN
HULL
3
9
1
13

Advertisement

Table of Contents
loading

Table of Contents