Bosch GREENSTAR HEATSLAVE EXTERNAL 18/25 Instruction Manual page 42

Open vent & sealed central heating systems with mains fed domestic hot water
Hide thumbs Also See for GREENSTAR HEATSLAVE EXTERNAL 18/25:
Table of Contents

Advertisement

8 716 113 389d
30/3/10
14:01
G
F
3
NOMINAL BOILER RATING AT NORMAL OPERATING TEMPERATURE
USING 28sec KEROSENE:
OIL
PUMP
NOZZLE
FLOW RATE
PRESSURE
(p.s.i.)
Kg/h
12/18 - Bentone Sterling 40 Burner:
0.35 80°SR
115
1.04
0.45 80°S
115
1.29
0.50 80°ES
140
1.55
18/25 - Bentone Sterling 50 Burner:
0.50 80°EH
130
1.56
0.55 80°EH
145
1.86
0.65 80°EH
150
2.17
12/18 - Riello RDB 1 Burner :
0.35 80°SR
105
1. 0 4
0.45 60°ES
120
1.29
0.50 60°ES
125
1.55
18/25 - Riello RDB 2.2 Burner
0.50 60°ES
125
1.56
0.65 60°ES
120
1.86
0.75 60°ES
115
2.17
25/32 - Riello RDB 2.2 Burner
0.75 60°ES
105
2.15
0.75 60°ES
140
2.45
0.85 60°ES
150
2.75
42
INSPECTION AND SERVICE
All manuals and user guides at all-guides.com
Page 42
3
2
A
E
F
APPROX
FUEL
APPROX.
FLUE
AIR
%CO
AIR
GAS
DAMPER
2
TEMP.
DISC
SETTING
l/h
( °C )
1.32
66
11.5
2.5
N/A
1.63
70
12.0
4.5
N/A
1.96
73
12.5
5.25
N/A
N/A
1.98
72
11.5
4.25
N/A
2.36
79
12.0
6.0
N/A
2.75
82
12.5
8.0
1.32
64
12 .0
4.5
12kW
1.63
67
12.0
3.0
15-18kW
1.96
72
12.5
4.5
15-18kW
:
18-25kW
1.98
75
11.5
2.0
2.36
78
12.0
3.0
18-25kW
2.75
84
12.5
4.5
18-25kW
:
2.72
78
11.5
3.0
N/A
3.10
80
12.0
4.0
N/A
3.48
83
12.5
5.0
N/A
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
INSPECTION AND SERVICE
1
Fire valve:
Check that the oil supply pipe has a fire valve
C
fitted at least 1m away from the appliance
B
with the fire valve sensor located within the
D
appliance case. A fire valve sensor clip (A) is
provided for this purpose.
Re-commission the burner:
1 Align burner combustion head (B) into the
IMPORTANT:
Ensure the gasket is a good seal between
the burner combustion head and the boiler
housing to prevent flue gases escaping.
2 Plug burner lead (F ) into control box (G).
Refit panels:
3 Refit the top panel and press down to
APPLIANCE
INPUT
OUTPUT
kW
Btu/hr
kW
Btu/hr
12.4
42300
12
40900
After service handover:
15.5
52900
15
51200
18.6
63500
18
61400
18.6
63300
18
61400
22.2
75100
21.5
73400
25.8
87900
25
85300
12.4
42300
12
40900
15.5
52900
15
51200
18.6
6 3500
18
61400
18.6
63300
18
61400
22.2
75100
21.5
73400
25.8
8 9700
25
85300
25.5
87040
25
85300
29.1
99200
28.5
97200
32.7
111400
32
109200
boiler housing tube with gasket (C)
correctly fitted.
Push firmly down to compress the gasket (C).
Tighten burner retainers (D) sufficiently to
ensure a good seal.
Refit flexible air duct and secure with clip ( E ).
Connect an oil pressure gauge to the oil
pump, run the burner and check the oil
pressure is correct for the required boiler
output. Check that the smoke reading is
between 0 and 1, if the smoke reading is
above 1 check the air setting. If the air
setting is correct check that the burner has
been reassembled correctly.
Allow the boiler to warm up then check the
combustion settings are correct as
indicated in the table below, adjust the
CO
if necessary using the air shutter.
2
When the combustion is correct turn off the
boiler, remove the pressure gauge and refit
the blanking plug and plastic cover.
compress the seal when fitting the
securing screws.
Push the front panel up behind the top
panel and push in at the base to secure
the screws with the tool provided.
Make a note of the date of any water treatment.
Set the controls back to the users
requirements.
Complete the service interval record at the
back of this manual and a CD11 or an
equivalent form.
If the appliance is unused and exposed to
freezing conditions; shut off all the mains
supplies, isolate the boiler and drain the
system and boiler, including the secondary
heat exchanger.
8 716 113 389d (03/2010)

Advertisement

Table of Contents
loading

Table of Contents