Boiler Installation - Bosch GREENSTAR HEATSLAVE EXTERNAL 18/25 Instruction Manual

Open vent & sealed central heating systems with mains fed domestic hot water
Hide thumbs Also See for GREENSTAR HEATSLAVE EXTERNAL 18/25:
Table of Contents

Advertisement

8 716 113 389d
30/3/10
14:01
WARNING: THIS APPLIANCE IS SERVICED AND REPAIRED EXTERNALLY.
EXTERNAL EQUIPMENT OPERATED AT 230V SHOULD NOT BE INSTALLED, SERVICED OR
REPAIRED UNDER ADVERSE WEATHER CONDITIONS.
THIS APPLIANCE IS INSTALLED AND SERVICED EXTERNALLY TO THE PROPERTY, BUT
THE ENGINEER MUST HAVE ACCESS TO THE INSIDE OF THE PROPERTY WHEN
INSTALLING OR SERVICING THE APPLIANCE.
4
C
B
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR HEATSLAVE EXTERNAL 12/18-18/25-25/32
8 716 113 389d (03/2010)
All manuals and user guides at all-guides.com
Page 21
3
5
E
D
2
A

BOILER INSTALLATION

NOTE: The cabinet is not load bearing
and only provides weather
protection for the boiler.
1 Mark position of the 100mm services
duct on the exterior wall and make a hole
through.
2 Remove the key for the door fasteners
from its transport position in the left hand
side panel flue outlet aperture.
Undo the screws at the bottom of
the front panel (using the key provided)
and remove the screws from the rear
panel pulling both panels out and down
to remove. Store safely away from the
installation point.
3 Remove the screws from the top panel
and lift up to remove, store safely away
from the installation point.
4 Loosen the flexible air duct clamp (A)
and remove the air duct from the burner.
Depress the locking ears to unplug the
burner lead (B) from the control box (C).
Unscrew the burner retainers (D), then
withdraw the burner (E) from the boiler and
store safely away from the installation point.
5 Remove the screws securing the base
panel to the transit pallet and lift the boiler
off the pallet and into its installation
position taking care not to scrape the
base panel across the hard standing.
Do not attempt to lift and position the
2
boiler on your own. Do not use the
copper pipes to move the boiler.
Fasten the base to the hard standing
using the holes provided. Care should be
taken to ensure that the base is level.
6 Measure the 100mmØ services duct to
give at least 10mm inside the casing and
to finish flush with the interior wall
surface, cut to size and fit the duct. Fit the
100mm sealing ring where the duct
enters the casing and seal the joint to the
exterior wall and inside the cabinet with a
suitable sealant.
BOILER INSTALLATION
21

Advertisement

Table of Contents
loading

Table of Contents